Riders · Facilities Commission · Article I: General Government
Capital Budget
Rider 3 in the 2026-27 Act, page I-49
Through the session
- 2024-25 Act In current law rider 3
- Introduced (Senate) Amended rider 3
- Introduced (House) Amended rider 3
- Senate substitute Amended rider 3
- House substitute Amended rider 3
- House passed Unchanged rider 3
- Conference Amended rider 3
- 2026-27 Act Amended rider 3
Pick any two steps to compare their wording.
What changed in the text
Conference → 2026-27 Act: 7 passages changed.
Removed words are struck through; added words are underlined. Sources: Conference · 2026-27 Act.
Every version: numbers, statuses and source pages
| Version | Rider | Against the version before | Against the current budget | Source |
|---|---|---|---|---|
| 2024-25 ActGeneral Appropriations Act, 2024-25 Biennium | 3 | First version | — | Page I-49 |
| Introduced (Senate)Senate Bill 1 as introduced (LBB recommended, Senate) | 3 | Amended | — | Page I-49 |
| Introduced (House)House Bill 1 as introduced (LBB recommended, House) | 3 | Amended | — | Page I-49 |
| Senate substituteCommittee Substitute for Senate Bill 1 | 3 | Amended | Amended | Page I-44 |
| House substituteHouse Committee Substitute for Senate Bill 1 | 3 | Amended | Amended | Page I-44 |
| House passedSenate Bill 1 as passed the second house | 3 | Unchanged | Amended | Page I-45 |
| ConferenceConference Committee Report for Senate Bill 1 | 3 | Amended | Amended | Page I-44 |
| 2026-27 ActGeneral Appropriations Act, 2026-27 Biennium | 3 | Amended | Amended | Page I-49 |
Full text of each wording
2026-27 Act
Source, page I-49Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Permian Basin Behavioral Health Center UB UB
(5) TSLAC Records and Archive Facility UB UB
(6) Brazoria County Law Enforcement Center 8,000,000 UB
(7) Permian Basin Healthcare
Infrastructure 123,321,000 UB
(8) Pflugerville Flex Space - Finish Out
(HB 500, 89th Legis.) UB UB
(9) State Insurance Building (HB 500,
89th Legis.) UB UB
(10) Sensitive Compartmentalized
Information Facility (HB 500, 89th Legis.) UB UB
Total, Construction of Buildings and Facilities $ 131,321,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 121,399,509 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
(5) Workplace Optimization 1,500,000 1,500,000
(6) James Earl Rudder Building Renewal
(HB 500, 89th Legis.) UB UB
(7) Sam Houston Building Relocation (HB
500, 89th Legis.) UB UB
Total Repair or Rehabilitation of Building and
Facilities $ 123,339,509 $ 1,500,000
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
f. Acquisition of Information Resource Technologies
(1) Building Control Network Bandwidth
Needs - Phase I (HB 500, 89th Legis.) $ UB $ UB
Total, Capital Budget $ 262,197,715 $ 3,356,273
Method of Financing (Capital Budget):
General Revenue Fund $ 140,122,992 $ 3,121,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 121,399,509 UB
Subtotal, General Revenue Fund - Dedicated $ 121,847,356 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 262,197,715 $ 3,356,273
Conference
Source, page I-44Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Permian Basin Behavioral Health Center UB UB
(5) TSLAC Records and Archive Facility UB UB
(6) Brazoria County Law Enforcement Center 8,000,000 UB
Total, Construction of Buildings and Facilities $ 8,000,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 121,399,509 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
(5) Workplace Optimization 1,500,000 1,500,000
Total Repair or Rehabilitation of Building and
Facilities $ 123,339,509 $ 1,500,000
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
Total, Capital Budget $ 138,876,715 $ 3,356,273
Method of Financing (Capital Budget):
General Revenue Fund $ 16,801,992 $ 3,121,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 121,399,509 UB
Subtotal, General Revenue Fund - Dedicated $ 121,847,356 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 138,876,715 $ 3,356,273
House substitute, House passed
Source, page I-45Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Texas-Mexico Border Wall 1,000,000 UB
(5) Permian Basin Behavioral Health Center UB UB
(6) TSLAC Records and Archive Facility UB UB
(7) James Earl Rudder Building Renewal 43,000,000 UB
(8) Sensitive Compartmentalized
Information Facilities 100,000,000 UB
Total, Construction of Buildings and Facilities $ 144,000,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 121,399,509 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
(5) Workplace Optimization 1,500,000 1,500,000
Total Repair or Rehabilitation of Building and
Facilities $ 123,339,509 $ 1,500,000
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
Total, Capital Budget $ 274,876,715 $ 3,356,273
Method of Financing (Capital Budget):
General Revenue Fund $ 152,801,992 $ 3,121,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 121,399,509 UB
Subtotal, General Revenue Fund - Dedicated $ 121,847,356 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 274,876,715 $ 3,356,273
Senate substitute
Source, page I-44Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Texas-Mexico Border Wall 1,000,000 UB
(5) Permian Basin Behavioral Health Center UB UB
(6) TSLAC Records and Archive Facility UB UB
(7) James Earl Rudder Building Renewal 43,000,000 UB
Total, Construction of Buildings and Facilities $ 44,000,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 111,375,696 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
(5) Workplace Optimization 4,500,000 4,500,000
Total Repair or Rehabilitation of Building and
Facilities $ 116,315,696 $ 4,500,000
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
Total, Capital Budget $ 167,852,902 $ 6,356,273
Method of Financing (Capital Budget):
General Revenue Fund $ 55,801,992 $ 6,121,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 111,375,696 UB
Subtotal, General Revenue Fund - Dedicated $ 111,823,543 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 167,852,902 $ 6,356,273
Introduced (House)
Source, page I-49Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Texas-Mexico Border Wall 1,000,000 UB
(5) Permian Basin Behavioral Health Center UB UB
(6) TSLAC Records and Archive Facility UB UB
(7) James Earl Rudder Building Renewal 43,000,000 UB
Total, Construction of Buildings and Facilities $ 44,000,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 111,375,696 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
Total Repair or Rehabilitation of Building and
Facilities $ 111,815,696 $ UB
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
Total, Data Center/Shared Technology Services $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
Total, Cybersecurity $ 723,644 $ 725,644
Total, Capital Budget $ 163,352,902 $ 1,856,273
Method of Financing (Capital Budget):
General Revenue Fund $ 51,301,992 $ 1,621,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 111,375,696 UB
Subtotal, General Revenue Fund - Dedicated $ 111,823,543 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 163,352,902 $ 1,856,273
Introduced (Senate)
Source, page I-49Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.
2026 2027
a. Construction of Buildings and Facilities
(1) Capital Complex Phase 1 (Construction) $ UB $ UB
(2) Capital Complex Phase 2 UB UB
(3) Guadalupe County Medical Facility UB UB
(4) Texas-Mexico Border Wall 1,000,000 UB
(5) Permian Basin Behavioral Health Center UB UB
(6) TSLAC Records and Archive Facility UB UB
(7) James Earl Rudder Building Renewal 43,000,000 UB
Total, Construction of Buildings and Facilities $ 44,000,000 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance and Renewal Program -
Renewal Construction 111,375,696 UB
& UB
(4) Federal Surplus Property Facilities
Renovation and Support 440,000 UB
Total Repair or Rehabilitation of Building and
Facilities $ 111,815,696 $ UB
c. Acquisition of Capital Equipment and Items
(1) Facilities Operations Capital
Equipment and Other Items $ 3,985,141 $ UB
(2) Secure Workplace Environment 1,968,439 441,560
Total, Acquisition of Capital Equipment and
Items $ 5,953,580 $ 441,560
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 859,982 $ 689,069
e. Cybersecurity
(1) Cybersecurity Services $ 723,644 $ 725,644
Total, Cybersecurity $ 723,644 $ 725,644
Total, Capital Budget $ 163,352,902 $ 1,856,273
Method of Financing (Capital Budget):
General Revenue Fund $ 51,301,992 $ 1,621,059
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 447,847 $ 7,847
Deferred Maintenance Account No. 5166 111,375,696 UB
Subtotal, General Revenue Fund - Dedicated $ 111,823,543 $ 7,847
Other Funds
Appropriated Receipts $ 109,258 $ 109,258
Interagency Contracts 118,109 118,109
Subtotal, Other Funds $ 227,367 $ 227,367
Total, Method of Financing $ 163,352,902 $ 1,856,273
2024-25 Act
Source, page I-49Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code §1232.103.
2024 2025
a. Construction of Buildings and Facilities
(1) Capitol Complex - Phase 2 $ 243,839,454 $ UB
& UB
(2) Capitol Complex - Phase 1
(Construction) UB UB
(3) Capitol Complex - Phase 1 (MLK Blvd) UB UB
(4) Guadalupe County Medical Facility 10,000,000 UB
(5) G. J. Sutton Building Development UB UB
(6) Texas-Mexico Border Wall 1,000,000 UB
(7) Permian Basin Behavioral Health Center UB UB
(8) TSLAC Records & Archive Facility UB UB
Total, Construction of Buildings and Facilities $ 254,839,454 $ UB
b. Repair or Rehabilitation of Buildings and Facilities
(1) Deferred Maintenance $ UB $ UB
(2) Lyndon Baines Johnson Building
Renovation UB UB
(3) Maintenance Renewal Program - Renewal
Construction 111,375,696 UB
(4) Federal Surplus Property Facilities
Renovation and Support 500,000 500,000
& UB Total, Repair or Rehabilitation of Buildings
and Facilities $ 111,875,696 $ 500,000
c. Acquisition of Capital Equipment and Items
(1) Secure Workplace Environment $ 2,928,323 $ 862,652
(2) Facilities Operations Capital
Equipment and Other Items 4,477,500 1,300,000
Total, Acquisition of Capital Equipment and
Items $ 7,405,823 $ 2,162,652
d. Data Center/Shared Technology Services
(1) Data Center Consolidation $ 454,793 $ 452,569
e. Cybersecurity
(1) Cybersecurity Services and Personnel $ 277,495 $ 179,932
Total, Capital Budget $ 374,853,261 $ 3,295,153
Method of Financing (Capital Budget):
General Revenue Fund $ 262,622,351 $ 2,560,511
General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund
Account No. 570 $ 507,847 $ 507,809
Deferred Maintenance Account No. 5166 111,375,696 UB
Subtotal, General Revenue Fund - Dedicated $ 111,883,543 $ 507,809
Other Funds
Appropriated Receipts $ 109,258 $ 108,724
Interagency Contracts 238,109 118,109
Subtotal, Other Funds $ 347,367 $ 226,833
Total, Method of Financing $ 374,853,261 $ 3,295,153