Riders · Facilities Commission · Article I: General Government

Capital Budget

Rider 3 in the 2026-27 Act, page I-49

Through the session

  1. 2024-25 Act In current law rider 3
  2. Introduced (Senate) Amended rider 3
  3. Introduced (House) Amended rider 3
  4. Senate substitute Amended rider 3
  5. House substitute Amended rider 3
  6. House passed Unchanged rider 3
  7. Conference Amended rider 3
  8. 2026-27 Act Amended rider 3

Pick any two steps to compare their wording.

What changed in the text

Conference → 2026-27 Act: 7 passages changed.

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103. 2026 2027 a. Construction of Buildings and Facilities (1) Capital Complex Phase 1 (Construction) $ UB $ UB (2) Capital Complex Phase 2 UB UB (3) Guadalupe County Medical Facility UB UB (4) Permian Basin Behavioral Health Center UB UB (5) TSLAC Records and Archive Facility UB UB (6) Brazoria County Law Enforcement Center 8,000,000 UB (7) Permian Basin Healthcare Infrastructure 123,321,000 UB (8) Pflugerville Flex Space - Finish Out (HB 500, 89th Legis.) UB UB (9) State Insurance Building (HB 500, 89th Legis.) UB UB (10) Sensitive Compartmentalized Information Facility (HB 500, 89th Legis.) UB UB Total, Construction of Buildings and Facilities $ 8,000,000 131,321,000 $ UB b. Repair or Rehabilitation of Buildings and Facilities (1) Deferred Maintenance $ UB $ UB (2) Lyndon Baines Johnson Building Renovation UB UB (3) Maintenance and Renewal Program - Renewal Construction 121,399,509 UB & UB (4) Federal Surplus Property Facilities Renovation and Support 440,000 UB (5) Workplace Optimization 1,500,000 1,500,000 (6) James Earl Rudder Building Renewal (HB 500, 89th Legis.) UB UB (7) Sam Houston Building Relocation (HB 500, 89th Legis.) UB UB Total Repair or Rehabilitation of Building and Facilities $ 123,339,509 $ 1,500,000 c. Acquisition of Capital Equipment and Items (1) Facilities Operations Capital Equipment and Other Items $ 3,985,141 $ UB (2) Secure Workplace Environment 1,968,439 441,560 Total, Acquisition of Capital Equipment and Items $ 5,953,580 $ 441,560 d. Data Center/Shared Technology Services (1) Data Center Consolidation $ 859,982 $ 689,069 e. Cybersecurity (1) Cybersecurity Services $ 723,644 $ 725,644 f. Acquisition of Information Resource Technologies (1) Building Control Network Bandwidth Needs - Phase I (HB 500, 89th Legis.) $ UB $ UB Total, Capital Budget $ 138,876,715 262,197,715 $ 3,356,273 Method of Financing (Capital Budget): General Revenue Fund $ 16,801,992 140,122,992 $ 3,121,059 General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund Account No. 570 $ 447,847 $ 7,847 Deferred Maintenance Account No. 5166 121,399,509 UB Subtotal, General Revenue Fund - Dedicated $ 121,847,356 $ 7,847 Other Funds Appropriated Receipts $ 109,258 $ 109,258 Interagency Contracts 118,109 118,109 Subtotal, Other Funds $ 227,367 $ 227,367 Total, Method of Financing $ 138,876,715 262,197,715 $ 3,356,273

Removed words are struck through; added words are underlined. Sources: Conference · 2026-27 Act.

Every version: numbers, statuses and source pages
VersionRider Against the version beforeAgainst the current budget Source
2024-25 ActGeneral Appropriations Act, 2024-25 Biennium 3 First version — Page I-49
Introduced (Senate)Senate Bill 1 as introduced (LBB recommended, Senate) 3 Amended — Page I-49
Introduced (House)House Bill 1 as introduced (LBB recommended, House) 3 Amended — Page I-49
Senate substituteCommittee Substitute for Senate Bill 1 3 Amended Amended Page I-44
House substituteHouse Committee Substitute for Senate Bill 1 3 Amended Amended Page I-44
House passedSenate Bill 1 as passed the second house 3 Unchanged Amended Page I-45
ConferenceConference Committee Report for Senate Bill 1 3 Amended Amended Page I-44
2026-27 ActGeneral Appropriations Act, 2026-27 Biennium 3 Amended Amended Page I-49
Full text of each wording

2026-27 Act

Source, page I-49

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                        2026               2027

a. Construction of Buildings and Facilities

        (1)   Capital Complex Phase 1 (Construction)              $            UB     $            UB
        (2)   Capital Complex Phase 2                                          UB                  UB
        (3)   Guadalupe County Medical Facility                                UB                  UB
        (4)   Permian Basin Behavioral Health Center                           UB                  UB
        (5)   TSLAC Records and Archive Facility                               UB                  UB
        (6)   Brazoria County Law Enforcement Center                      8,000,000                UB

(7) Permian Basin Healthcare

              Infrastructure                                            123,321,000                UB

(8) Pflugerville Flex Space - Finish Out

              (HB 500, 89th Legis.)                                            UB                  UB

(9) State Insurance Building (HB 500,

              89th Legis.)                                                     UB                  UB

(10) Sensitive Compartmentalized

              Information Facility (HB 500, 89th Legis.)                       UB                  UB
         Total, Construction of Buildings and Facilities           $    131,321,000   $            UB

b. Repair or Rehabilitation of Buildings and Facilities

         (1)  Deferred Maintenance                            $           UB    $             UB

(2) Lyndon Baines Johnson Building

              Renovation                                                  UB                  UB

(3) Maintenance and Renewal Program -

              Renewal Construction                                 121,399,509                UB

& UB

(4) Federal Surplus Property Facilities

              Renovation and Support                                   440,000                UB
         (5)  Workplace Optimization                                 1,500,000         1,500,000

(6) James Earl Rudder Building Renewal

              (HB 500, 89th Legis.)                                       UB                  UB

(7) Sam Houston Building Relocation (HB

              500, 89th Legis.)                                           UB                  UB

Total Repair or Rehabilitation of Building and

         Facilities                                           $    123,339,509  $      1,500,000

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

              Equipment and Other Items                       $      3,985,141  $             UB
         (2)  Secure Workplace Environment                           1,968,439           441,560

Total, Acquisition of Capital Equipment and

         Items                                                $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

         (1)  Data Center Consolidation                       $        859,982  $        689,069

e. Cybersecurity

         (1)  Cybersecurity Services                          $        723,644  $        725,644

f. Acquisition of Information Resource Technologies

(1) Building Control Network Bandwidth

              Needs - Phase I (HB 500, 89th Legis.)           $           UB    $             UB
         Total, Capital Budget                                $    262,197,715  $      3,356,273

Method of Financing (Capital Budget):

     General Revenue Fund                                     $    140,122,992  $      3,121,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

         Account No. 570                                      $        447,847  $            7,847
     Deferred Maintenance Account No. 5166                         121,399,509                UB
         Subtotal, General Revenue Fund - Dedicated           $    121,847,356  $            7,847

Other Funds

     Appropriated Receipts                                    $        109,258  $        109,258
     Interagency Contracts                                             118,109           118,109
         Subtotal, Other Funds                                $        227,367  $        227,367
         Total, Method of Financing                           $    262,197,715  $      3,356,273

Conference

Source, page I-44

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                       2026                2027

a. Construction of Buildings and Facilities

        (1)  Capital Complex Phase 1 (Construction)               $            UB     $           UB
        (2)  Capital Complex Phase 2                                           UB                 UB
        (3)  Guadalupe County Medical Facility                                 UB                 UB
        (4)  Permian Basin Behavioral Health Center                            UB                 UB
        (5)  TSLAC Records and Archive Facility                                UB                 UB
        (6)  Brazoria County Law Enforcement Center                       8,000,000               UB
         Total, Construction of Buildings and Facilities          $       8,000,000   $           UB

b. Repair or Rehabilitation of Buildings and Facilities

        (1)  Deferred Maintenance                                 $            UB     $           UB

(2) Lyndon Baines Johnson Building

             Renovation                                                        UB                 UB

(3) Maintenance and Renewal Program -

             Renewal Construction                                       121,399,509               UB

& UB

(4) Federal Surplus Property Facilities

             Renovation and Support                                    440,000                UB
        (5)  Workplace Optimization                                  1,500,000         1,500,000

Total Repair or Rehabilitation of Building and

         Facilities                                           $    123,339,509  $      1,500,000

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

             Equipment and Other Items                        $      3,985,141  $             UB
        (2)  Secure Workplace Environment                            1,968,439           441,560

Total, Acquisition of Capital Equipment and

         Items                                                $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

        (1)  Data Center Consolidation                        $        859,982  $        689,069

e. Cybersecurity

        (1)  Cybersecurity Services                           $        723,644  $        725,644
         Total, Capital Budget                                $    138,876,715  $      3,356,273

Method of Financing (Capital Budget):

     General Revenue Fund                                     $     16,801,992  $      3,121,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

         Account No. 570                                      $        447,847  $            7,847
     Deferred Maintenance Account No. 5166                         121,399,509                UB
         Subtotal, General Revenue Fund - Dedicated           $    121,847,356  $            7,847

Other Funds

     Appropriated Receipts                                    $        109,258  $        109,258
     Interagency Contracts                                             118,109           118,109
         Subtotal, Other Funds                                $        227,367  $        227,367
         Total, Method of Financing                           $    138,876,715  $      3,356,273

House substitute, House passed

Source, page I-45

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                    2026              2027

a. Construction of Buildings and Facilities

         (1)  Capital Complex Phase 1 (Construction)           $           UB    $            UB
         (2)  Capital Complex Phase 2                                      UB                 UB
         (3)  Guadalupe County Medical Facility                            UB                 UB
         (4)  Texas-Mexico Border Wall                                1,000,000               UB
         (5)  Permian Basin Behavioral Health Center                       UB                 UB
         (6)  TSLAC Records and Archive Facility                           UB                 UB
         (7)  James Earl Rudder Building Renewal                     43,000,000               UB

(8) Sensitive Compartmentalized

              Information Facilities                                100,000,000               UB
         Total, Construction of Buildings and Facilities       $    144,000,000  $            UB

b. Repair or Rehabilitation of Buildings and Facilities

         (1)  Deferred Maintenance                             $           UB    $            UB

(2) Lyndon Baines Johnson Building

              Renovation                                                   UB                 UB

(3) Maintenance and Renewal Program -

              Renewal Construction                                  121,399,509               UB

& UB

(4) Federal Surplus Property Facilities

              Renovation and Support                                    440,000               UB
         (5)  Workplace Optimization                                  1,500,000         1,500,000

Total Repair or Rehabilitation of Building and

         Facilities                                            $    123,339,509  $      1,500,000

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

              Equipment and Other Items                        $      3,985,141  $            UB
         (2)  Secure Workplace Environment                            1,968,439           441,560

Total, Acquisition of Capital Equipment and

         Items                                                 $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

         (1)  Data Center Consolidation                        $        859,982  $        689,069

e. Cybersecurity

         (1)  Cybersecurity Services                           $        723,644  $        725,644
         Total, Capital Budget                                 $    274,876,715  $      3,356,273

Method of Financing (Capital Budget):

      General Revenue Fund                                     $    152,801,992  $      3,121,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

         Account No. 570                                       $        447,847  $          7,847
      Deferred Maintenance Account No. 5166                         121,399,509               UB
         Subtotal, General Revenue Fund - Dedicated            $    121,847,356  $          7,847

Other Funds

      Appropriated Receipts                                    $        109,258  $        109,258
     Interagency Contracts                                             118,109           118,109
        Subtotal, Other Funds                            $             227,367  $        227,367
        Total, Method of Financing                       $       274,876,715    $      3,356,273

Senate substitute

Source, page I-44

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                       2026                2027

a. Construction of Buildings and Facilities

        (1)  Capital Complex Phase 1 (Construction)               $            UB     $            UB
        (2)  Capital Complex Phase 2                                           UB                  UB
        (3)  Guadalupe County Medical Facility                                 UB                  UB
        (4)  Texas-Mexico Border Wall                                     1,000,000                UB
        (5)  Permian Basin Behavioral Health Center                            UB                  UB
        (6)  TSLAC Records and Archive Facility                                UB                  UB
        (7)  James Earl Rudder Building Renewal                          43,000,000                UB
        Total, Construction of Buildings and Facilities           $      44,000,000   $            UB

b. Repair or Rehabilitation of Buildings and Facilities

        (1)  Deferred Maintenance                                 $            UB     $            UB

(2) Lyndon Baines Johnson Building

             Renovation                                                  UB                   UB

(3) Maintenance and Renewal Program -

             Renewal Construction                                 111,375,696                 UB

& UB

(4) Federal Surplus Property Facilities

             Renovation and Support                                   440,000                 UB
        (5)  Workplace Optimization                                 4,500,000         4,500,000

Total Repair or Rehabilitation of Building and

        Facilities                                           $    116,315,696  $      4,500,000

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

             Equipment and Other Items                       $      3,985,141  $              UB
        (2)  Secure Workplace Environment                           1,968,439           441,560

Total, Acquisition of Capital Equipment and

        Items                                                $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

        (1)  Data Center Consolidation                       $        859,982  $        689,069

e. Cybersecurity

        (1)  Cybersecurity Services                          $        723,644  $        725,644
        Total, Capital Budget                                $    167,852,902  $      6,356,273

Method of Financing (Capital Budget):

     General Revenue Fund                                    $     55,801,992  $      6,121,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

        Account No. 570                                      $        447,847  $             7,847
     Deferred Maintenance Account No. 5166                        111,375,696                 UB
        Subtotal, General Revenue Fund - Dedicated           $    111,823,543  $             7,847

Other Funds

     Appropriated Receipts                                   $        109,258  $        109,258
     Interagency Contracts                                            118,109           118,109
        Subtotal, Other Funds                                $        227,367  $        227,367
        Total, Method of Financing                           $    167,852,902  $      6,356,273

Introduced (House)

Source, page I-49

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                    2026              2027

a. Construction of Buildings and Facilities

        (1)  Capital Complex Phase 1 (Construction)            $           UB    $            UB
        (2)  Capital Complex Phase 2                                       UB                 UB
        (3)  Guadalupe County Medical Facility                             UB                 UB
        (4)  Texas-Mexico Border Wall                                 1,000,000               UB
        (5)  Permian Basin Behavioral Health Center                        UB                 UB
        (6)  TSLAC Records and Archive Facility                            UB                 UB
        (7)  James Earl Rudder Building Renewal                      43,000,000               UB
         Total, Construction of Buildings and Facilities       $     44,000,000  $            UB

b. Repair or Rehabilitation of Buildings and Facilities

        (1)  Deferred Maintenance                              $           UB    $            UB

(2) Lyndon Baines Johnson Building

             Renovation                                                    UB                 UB

(3) Maintenance and Renewal Program -

             Renewal Construction                                   111,375,696               UB

& UB

(4) Federal Surplus Property Facilities

             Renovation and Support                                     440,000               UB

Total Repair or Rehabilitation of Building and

         Facilities                                            $    111,815,696  $            UB

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

             Equipment and Other Items                         $      3,985,141  $            UB
        (2)  Secure Workplace Environment                             1,968,439           441,560

Total, Acquisition of Capital Equipment and

         Items                                                 $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

        (1)  Data Center Consolidation                         $        859,982  $        689,069
         Total, Data Center/Shared Technology Services         $        859,982  $        689,069

e. Cybersecurity

        (1)  Cybersecurity Services                            $        723,644  $        725,644
         Total, Cybersecurity                                  $        723,644  $        725,644
         Total, Capital Budget                                 $    163,352,902  $      1,856,273

Method of Financing (Capital Budget):

     General Revenue Fund                                      $     51,301,992  $      1,621,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

         Account No. 570                                       $        447,847  $          7,847
     Deferred Maintenance Account No. 5166                          111,375,696               UB
         Subtotal, General Revenue Fund - Dedicated            $    111,823,543  $          7,847

Other Funds

     Appropriated Receipts                                     $        109,258  $        109,258
     Interagency Contracts                                              118,109           118,109
         Subtotal, Other Funds                                 $        227,367  $        227,367
        Total, Method of Financing                             $    163,352,902  $      1,856,273

Introduced (Senate)

Source, page I-49

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code, Section 1232.103.

                                                                    2026              2027

a. Construction of Buildings and Facilities

        (1)  Capital Complex Phase 1 (Construction)            $           UB    $            UB
        (2)  Capital Complex Phase 2                                       UB                 UB
        (3)  Guadalupe County Medical Facility                             UB                 UB
        (4)  Texas-Mexico Border Wall                                 1,000,000               UB
        (5)  Permian Basin Behavioral Health Center                        UB                 UB
        (6)  TSLAC Records and Archive Facility                            UB                 UB
        (7)  James Earl Rudder Building Renewal                      43,000,000               UB
         Total, Construction of Buildings and Facilities       $     44,000,000  $            UB

b. Repair or Rehabilitation of Buildings and Facilities

        (1)  Deferred Maintenance                              $           UB    $            UB

(2) Lyndon Baines Johnson Building

             Renovation                                                    UB                 UB

(3) Maintenance and Renewal Program -

             Renewal Construction                                   111,375,696               UB

& UB

(4) Federal Surplus Property Facilities

             Renovation and Support                                     440,000               UB

Total Repair or Rehabilitation of Building and

         Facilities                                            $    111,815,696  $            UB

c. Acquisition of Capital Equipment and Items

(1) Facilities Operations Capital

             Equipment and Other Items                         $      3,985,141  $            UB
        (2)  Secure Workplace Environment                           1,968,439           441,560

Total, Acquisition of Capital Equipment and

         Items                                               $      5,953,580  $        441,560

d. Data Center/Shared Technology Services

        (1)  Data Center Consolidation                       $        859,982  $        689,069

e. Cybersecurity

        (1)  Cybersecurity Services                          $        723,644  $        725,644
         Total, Cybersecurity                                $        723,644  $        725,644
         Total, Capital Budget                               $    163,352,902  $      1,856,273

Method of Financing (Capital Budget):

     General Revenue Fund                                    $     51,301,992  $      1,621,059

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

         Account No. 570                                     $        447,847  $          7,847
     Deferred Maintenance Account No. 5166                        111,375,696               UB
         Subtotal, General Revenue Fund - Dedicated          $    111,823,543  $          7,847

Other Funds

     Appropriated Receipts                                   $        109,258  $        109,258
     Interagency Contracts                                            118,109           118,109
         Subtotal, Other Funds                               $        227,367  $        227,367
         Total, Method of Financing                          $    163,352,902  $      1,856,273

2024-25 Act

Source, page I-49

Capital Budget. None of the funds appropriated above may be expended for capital budget items except as listed below. The amounts shown below shall be expended only for the purposes shown and are not available for expenditure for other purposes. Amounts appropriated above and identified in this provision as appropriations either for "Lease Payments to the Master Lease Purchase Program" or for items with an "(MLPP)" notation shall be expended only for the purpose of making lease-purchase payments to the Texas Public Finance Authority pursuant to the provisions of Government Code §1232.103.

                                                                   2024              2025

a. Construction of Buildings and Facilities

        (1)  Capitol Complex - Phase 2                        $    243,839,454  $            UB

& UB

(2) Capitol Complex - Phase 1

             (Construction)                                               UB                 UB
        (3)  Capitol Complex - Phase 1 (MLK Blvd)                         UB                 UB
        (4)  Guadalupe County Medical Facility                      10,000,000               UB
        (5)  G. J. Sutton Building Development                            UB                 UB
        (6)  Texas-Mexico Border Wall                                1,000,000               UB
        (7)  Permian Basin Behavioral Health Center                       UB                 UB
        (8)  TSLAC Records & Archive Facility                             UB                 UB
        Total, Construction of Buildings and Facilities       $    254,839,454  $            UB

b. Repair or Rehabilitation of Buildings and Facilities

        (1)  Deferred Maintenance                             $           UB    $            UB

(2) Lyndon Baines Johnson Building

             Renovation                                                   UB                 UB

(3) Maintenance Renewal Program - Renewal

             Construction                                          111,375,696               UB

(4) Federal Surplus Property Facilities

             Renovation and Support                                    500,000           500,000

& UB Total, Repair or Rehabilitation of Buildings

        and Facilities                                        $    111,875,696  $        500,000

c. Acquisition of Capital Equipment and Items

        (1)  Secure Workplace Environment                     $      2,928,323  $        862,652

(2) Facilities Operations Capital

             Equipment and Other Items                               4,477,500         1,300,000

Total, Acquisition of Capital Equipment and

        Items                                                 $      7,405,823  $      2,162,652

d. Data Center/Shared Technology Services

        (1)  Data Center Consolidation                        $        454,793  $        452,569

e. Cybersecurity

        (1)  Cybersecurity Services and Personnel             $        277,495  $        179,932
        Total, Capital Budget                                 $    374,853,261  $      3,295,153

Method of Financing (Capital Budget):

     General Revenue Fund                                     $    262,622,351  $      2,560,511

General Revenue Fund - Dedicated Federal Surplus Property Service Charge Fund

        Account No. 570                                       $        507,847  $        507,809
     Deferred Maintenance Account No. 5166                         111,375,696               UB
        Subtotal, General Revenue Fund - Dedicated            $    111,883,543  $        507,809

Other Funds

     Appropriated Receipts                                    $        109,258  $        108,724
     Interagency Contracts                                          238,109            118,109
        Subtotal, Other Funds                             $         347,367   $        226,833
        Total, Method of Financing                        $      374,853,261  $      3,295,153