Riders · Soil and Water Conservation Board · Article VI: Natural Resources
Flood Control Dam Funding
Rider 9 in the 2026-27 Act, page VI-67
2028-29 request. Soil and Water Conservation Board's request has a row with this rider's number. What that row asks could not be checked, so it is not shown. The agency's request.
Through the session
- 2024-25 Act Not in this version
- Introduced (Senate) New rider 10
- Introduced (House) New rider 10
- Senate substitute Unchanged rider 9
- House substitute Unchanged rider 9
- House passed Unchanged rider 9
- Conference Unchanged rider 9
- 2026-27 Act Unchanged rider 9
Pick any two steps to compare their wording.
What changed in the text
Conference → 2026-27 Act: the same text in both versions.
Removed words are struck through; added words are underlined. Sources: Conference · 2026-27 Act.
Every version: numbers, statuses and source pages
| Version | Rider | Against the version before | Against the current budget | Source |
|---|---|---|---|---|
| 2024-25 ActGeneral Appropriations Act, 2024-25 Biennium | Not in this version | |||
| Introduced (Senate)Senate Bill 1 as introduced (LBB recommended, Senate) | 10 | New | — | Page VI-68 |
| Introduced (House)House Bill 1 as introduced (LBB recommended, House) | 10 | New | — | Page VI-68 |
| Senate substituteCommittee Substitute for Senate Bill 1 | 9 was 10 | Unchanged | New | Page VI-61 |
| House substituteHouse Committee Substitute for Senate Bill 1 | 9 | Unchanged | New | Page VI-62 |
| House passedSenate Bill 1 as passed the second house | 9 | Unchanged | New | Page VI-64 |
| ConferenceConference Committee Report for Senate Bill 1 | 9 | Unchanged | New | Page VI-64 |
| 2026-27 ActGeneral Appropriations Act, 2026-27 Biennium | 9 | Unchanged | New | Page VI-67 |
Full text of each wording
Introduced (Senate), Introduced (House), Senate substitute, House substitute, House passed, Conference, 2026-27 Act
Source, page VI-67Flood Control Dam Funding. Amounts appropriated above to the Soil and Water Conservation Board include $2,000,000 from the General Revenue Fund each fiscal year of the 2026-27 biennium in Strategy A.2.1, Flood Control Dam Maintenance, and $15,000,000 from the General Revenue Fund and an estimated $11,649,044 in Federal Funds each fiscal year of the 2026-27 biennium in Strategy A.2.2, Flood Control Dam Construction, only for the purpose of providing flood control dam maintenance, operations, engineering, and construction funding for flood control dam projects.