Riders · Railroad Commission · Article VI: Natural Resources

Performance Measure Targets

Rider 1 in the 2026-27 Act, page VI-58

2028-29 request. Railroad Commission's request has a row with this rider's number. What that row asks could not be checked, so it is not shown. The agency's request.

Through the session

  1. 2024-25 Act In current law rider 1
  2. Introduced (Senate) Amended rider 1
  3. Introduced (House) Amended rider 1
  4. Senate substitute Unchanged rider 1
  5. House substitute Unchanged rider 1
  6. House passed Unchanged rider 1
  7. Conference Unchanged rider 1
  8. 2026-27 Act Unchanged rider 1

Pick any two steps to compare their wording.

What changed in the text

2024-25 Act → Introduced (House): 23 passages changed.

Performance Measure Targets. The following is a listing of the key performance target levels for the Railroad Commission. It is the intent of the Legislature that appropriations made by this Act be utilized in the most efficient and effective manner possible to achieve the intended mission of the Railroad Commission. In order to achieve the objectives and service standards established by this Act, the Railroad Commission shall make every effort to attain the following designated key performance target levels associated with each item of appropriation. 2024 2025 2026 2027 A. Goal: ENERGY RESOURCES Outcome (Results/Impact): Percent of Oil and Gas Wells That Are Active 68% 69% 65% 65% A.1.1. Strategy: ENERGY RESOURCE DEVELOPMENT Output (Volume): Number of Drilling Permit Applications Processed 15,400 15,000 12,500 12,500 Number of Wells Monitored 440,440 440,440 435,000 435,000 Efficiencies: Average Number of Wells Monitored Per Analyst 36,600 36,600 33,500 33,500 The Average Number of Staff Days Required to Review and Process a Drilling Permit Application During the Reporting Period 3 3 B. Goal: SAFETY PROGRAMS Outcome (Results/Impact): Average Number of Pipeline Safety Violations Per Equivalent 100 Miles of Pipe Identified through Inspections 0.5 0.5 0.8 0.8 B.1.1. Strategy: PIPELINE SAFETY Output (Volume): Number of Pipeline Safety Inspections Performed 1,750 1,750 2,100 2,100 Efficiencies: Average Number of Pipeline Field Inspections Per Field Inspector 85 85 B.1.2. Strategy: PIPELINE DAMAGE PREVENTION Output (Volume): Number of Excavation Damage Enforcement Cases Completed 2,200 2,100 3,500 3,000 B.2.1. Strategy: REGULATE ALT FUEL RESOURCES Output (Volume): Number of LPG/LNG/CNG Safety Inspections Performed 20,000 20,000 C. Goal: ENVIRONMENTAL & CONSUMER PROTECTION Outcome (Results/Impact): Percentage of Oil and Gas Facility Inspections That Identify Environmental Violations 5% 5% Percentage of Known Orphaned Wells Plugged with State-Managed Funds 20% 20% 17.5% 17.5% C.1.1. Strategy: OIL/GAS MONITOR & INSPECTIONS Output (Volume): Number of Oil and Gas Well and Facility Inspections Performed 355,000 360,000 425,000 425,000 Number of Oil and Gas Environmental Permit Applications and Reports Processed 110,000 110,000 132,000 132,000 Efficiencies: Average Number of Oil and Gas Well and Facility Inspections Performed by District Staff 1,900 1,900 2,000 2,000 Explanatory: Number of UIC Wells and Other Facilities Subject to Regulation 90,000 90,000 80,000 80,000 C.1.2. Strategy: SURFACE MINING MONITORING/INSPECT Output (Volume): Number of Coal Mining Inspections Performed 400 400 390 395 C.2.1. Strategy: OIL&GAS WELL PLUGGING & REMEDIATION Output (Volume): Number of Abandoned Pollution Sites Investigated, Assessed, or Cleaned Up with State-Managed Funds 400 400 250 250 Number of Orphaned Wells Plugged with State-Managed Funds 2,000 2,200 1,700 1,700 Total Aggregate Plugging Depth of Orphaned Wells Plugged with State-Managed Funds (in Linear Feet) 4,000,000 4,400,000 3,500,000 3,500,000 C.3.1. Strategy: GAS UTILITY COMMERCE Output (Volume): Number of Gas Utility Dockets and Cases Filed 80 80 50 50 C.4.1. Strategy: WEATHER PREPAREDNESS Output (Volume): Total Number of Inspections at Sites That Are Required to Weatherize during the Reporting Period 7,000 7,100 7,234 7,379 Total Number of Facilities That Are Required to Weatherize Identified to Be Non-complaint with Weatherization Standards 665 640 3 3 Explanatory: Total Number of Designated Critical Infrastructure Facilities in the State 73,500 73,500 39,378 40,559 D. Goal: PUBLIC ACCESS TO INFO AND SERVICES D.1.1. Strategy: PUBLIC INFORMATION AND SERVICES Output (Volume): Number of Documents Provided to Customers by Information Services 191,000 191,000 100,000 100,000

Removed words are struck through; added words are underlined. Sources: 2024-25 Act · Introduced (House).

Every version: numbers, statuses and source pages
VersionRider Against the version beforeAgainst the current budget Source
2024-25 ActGeneral Appropriations Act, 2024-25 Biennium 1 First version — Page VI-55
Introduced (Senate)Senate Bill 1 as introduced (LBB recommended, Senate) 1 Amended — Page VI-59
Introduced (House)House Bill 1 as introduced (LBB recommended, House) 1 Amended — Page VI-59
Senate substituteCommittee Substitute for Senate Bill 1 1 Unchanged Amended Page VI-53
House substituteHouse Committee Substitute for Senate Bill 1 1 Unchanged Amended Page VI-54
House passedSenate Bill 1 as passed the second house 1 Unchanged Amended Page VI-55
ConferenceConference Committee Report for Senate Bill 1 1 Unchanged Amended Page VI-55
2026-27 ActGeneral Appropriations Act, 2026-27 Biennium 1 Unchanged Amended Page VI-58
Full text of each wording

Introduced (Senate), Introduced (House), Senate substitute, House substitute, House passed, Conference, 2026-27 Act

Source, page VI-58

Performance Measure Targets. The following is a listing of the key performance target levels for the Railroad Commission. It is the intent of the Legislature that appropriations made by this Act be utilized in the most efficient and effective manner possible to achieve the intended mission of the Railroad Commission. In order to achieve the objectives and service standards established by this Act, the Railroad Commission shall make every effort to attain the following designated key performance target levels associated with each item of appropriation.

                                                                                 2026                2027

A. Goal: ENERGY RESOURCES Outcome (Results/Impact):

      Percent of Oil and Gas Wells That Are Active                                  65%                 65%

A.1.1. Strategy: ENERGY RESOURCE DEVELOPMENT Output (Volume):

         Number of Drilling Permit Applications Processed                         12,500              12,500
         Number of Wells Monitored                                               435,000             435,000

Efficiencies:

         Average Number of Wells Monitored Per Analyst                            33,500              33,500

The Average Number of Staff Days Required to Review and Process a Drilling Permit Application During the

           Reporting Period                                                           3                   3

B. Goal: SAFETY PROGRAMS Outcome (Results/Impact):

Average Number of Pipeline Safety Violations Per Equivalent

       100 Miles of Pipe Identified through Inspections                              0.8                 0.8

B.1.1. Strategy: PIPELINE SAFETY Output (Volume):

         Number of Pipeline Safety Inspections Performed                           2,100               2,100

Efficiencies:

Average Number of Pipeline Field Inspections Per Field

           Inspector                                                                 85                   85

B.1.2. Strategy: PIPELINE DAMAGE PREVENTION Output (Volume):

         Number of Excavation Damage Enforcement Cases Completed                   3,500               3,000

B.2.1. Strategy: REGULATE ALT FUEL RESOURCES Output (Volume):

       Number of LPG/LNG/CNG Safety Inspections Performed                       20,000               20,000

C. Goal: ENVIRONMENTAL & CONSUMER PROTECTION Outcome (Results/Impact):

Percentage of Oil and Gas Facility Inspections That

     Identify Environmental Violations                                             5%                   5%

Percentage of Known Orphaned Wells Plugged with

     State-Managed Funds                                                        17.5%                17.5%

C.1.1. Strategy: OIL/GAS MONITOR & INSPECTIONS Output (Volume):

Number of Oil and Gas Well and Facility Inspections

         Performed                                                             425,000              425,000

Number of Oil and Gas Environmental Permit Applications

         and Reports Processed                                                 132,000              132,000

Efficiencies:

Average Number of Oil and Gas Well and Facility

         Inspections Performed by District Staff                                 2,000                2,000

Explanatory:

Number of UIC Wells and Other Facilities Subject to

         Regulation                                                             80,000               80,000

C.1.2. Strategy: SURFACE MINING MONITORING/INSPECT Output (Volume):

       Number of Coal Mining Inspections Performed                                 390                 395

C.2.1. Strategy: OIL&GAS WELL PLUGGING & REMEDIATION Output (Volume):

Number of Abandoned Pollution Sites Investigated,

         Assessed, or Cleaned Up with State-Managed Funds                          250                 250

Number of Orphaned Wells Plugged with State-Managed

         Funds                                                                   1,700                1,700

Total Aggregate Plugging Depth of Orphaned Wells

         Plugged with State-Managed Funds (in Linear Feet)                    3,500,000           3,500,000

C.3.1. Strategy: GAS UTILITY COMMERCE Output (Volume):

       Number of Gas Utility Dockets and Cases Filed                                50                  50

C.4.1. Strategy: WEATHER PREPAREDNESS Output (Volume):

Total Number of Inspections at Sites That Are Required

         to Weatherize during the Reporting Period                               7,234                7,379

Total Number of Facilities That Are Required to Weatherize Identified to Be Non-complaint with

         Weatherization Standards                                                    3                   3

Explanatory:

Total Number of Designated Critical Infrastructure

         Facilities in the State                                                39,378               40,559

D. Goal: PUBLIC ACCESS TO INFO AND SERVICES D.1.1. Strategy: PUBLIC INFORMATION AND SERVICES Output (Volume):

Number of Documents Provided to Customers by

         Information Services                                                  100,000              100,000

2024-25 Act

Source, page VI-55

Performance Measure Targets. The following is a listing of the key performance target levels for the Railroad Commission. It is the intent of the Legislature that appropriations made by this Act be utilized in the most efficient and effective manner possible to achieve the intended mission of the Railroad Commission. In order to achieve the objectives and service standards established by this Act, the Railroad Commission shall make every effort to attain the following designated key performance target levels associated with each item of appropriation.

                                                                                  2024               2025

A. Goal: ENERGY RESOURCES Outcome (Results/Impact):

      Percent of Oil and Gas Wells That Are Active                                  68%                 69%

A.1.1. Strategy: ENERGY RESOURCE DEVELOPMENT Output (Volume):

         Number of Drilling Permit Applications Processed                         15,400              15,000
         Number of Wells Monitored                                               440,440             440,440

Efficiencies:

         Average Number of Wells Monitored Per Analyst                            36,600              36,600

The Average Number of Staff Days Required to Review and Process a Drilling Permit Application During the

           Reporting Period                                                            3                  3

B. Goal: SAFETY PROGRAMS Outcome (Results/Impact):

Average Number of Pipeline Safety Violations Per Equivalent

       100 Miles of Pipe Identified through Inspections                              0.5                 0.5

B.1.1. Strategy: PIPELINE SAFETY Output (Volume):

         Number of Pipeline Safety Inspections Performed                           1,750               1,750

Efficiencies:

Average Number of Pipeline Field Inspections Per Field

           Inspector                                                                  85                  85

B.1.2. Strategy: PIPELINE DAMAGE PREVENTION Output (Volume):

         Number of Excavation Damage Enforcement Cases Completed                   2,200               2,100

B.2.1. Strategy: REGULATE ALT FUEL RESOURCES Output (Volume):

         Number of LPG/LNG/CNG Safety Inspections Performed                       20,000              20,000

C. Goal: ENVIRONMENTAL & CONSUMER PROTECTION Outcome (Results/Impact):

Percentage of Oil and Gas Facility Inspections That

       Identify Environmental Violations                                             5%                  5%

Percentage of Known Orphaned Wells Plugged with

       State-Managed Funds                                                          20%                 20%

C.1.1. Strategy: OIL/GAS MONITOR & INSPECTIONS Output (Volume):

Number of Oil and Gas Well and Facility Inspections

         Performed                                                             355,000             360,000

Number of Oil and Gas Environmental Permit Applications

         and Reports Processed                                                 110,000             110,000

Efficiencies:

Average Number of Oil and Gas Well and Facility

         Inspections Performed by District Staff                                 1,900               1,900

Explanatory:

Number of UIC Wells and Other Facilities Subject to

         Regulation                                                             90,000              90,000

C.1.2. Strategy: SURFACE MINING MONITORING/INSPECT Output (Volume):

       Number of Coal Mining Inspections Performed                                400                 400

C.2.1. Strategy: OIL&GAS WELL PLUGGING & REMEDIATION Output (Volume):

Number of Abandoned Pollution Sites Investigated,

         Assessed, or Cleaned Up with State-Managed Funds                         400                 400

Number of Orphaned Wells Plugged with State-Managed

         Funds                                                                   2,000               2,200

Total Aggregate Plugging Depth of Orphaned Wells

         Plugged with State-Managed Funds (in Linear Feet)                   4,000,000           4,400,000

C.3.1. Strategy: GAS UTILITY COMMERCE Output (Volume):

       Number of Gas Utility Dockets Filed                                         80                  80

C.4.1. Strategy: WEATHER PREPAREDNESS Output (Volume):

Total Number of Inspections at Sites That Are Required

         to Weatherize during the Reporting Period                               7,000               7,100

Total Number of Facilities That Are Required to Weatherize Identified to Be Non-complaint with

         Weatherization Standards                                                 665                 640

Explanatory:

Total Number of Designated Critical Infrastructure

         Facilities in the State                                                73,500              73,500

D. Goal: PUBLIC ACCESS TO INFO AND SERVICES D.1.1. Strategy: PUBLIC INFORMATION AND SERVICES Output (Volume):

Number of Documents Provided to Customers by

         Information Services                                                  191,000             191,000