Requests · Department of Public Safety

New Infrastructure and Maintenance

Priority 1 · one of 5 items in the Department of Public Safety's request for 2028-29 · The item begins on page 199 of the request

This is a request, not an appropriation.

Read from a scan. The dollar and position figures below were read the same in more than one schedule of the document. The name, the priority and the text were read once by machine and may contain misread characters.

What is asked

20282029Two years
All funds$538,825,029$12,204,768$551,029,797
Of which general revenue and general revenue-dedicated $538,825,029$12,204,768$551,029,797
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$538,825,029$12,204,768
Total, as the request prints it$538,825,029$12,204,768

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
05-01-05 Infrastructure OperationsIn the current budget: E.1.5 INFRASTRUCTURE OPERATIONS $538,825,029$12,204,768— $37,394,889 $30,133,836

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The agency's estimate203020312032Three years
All funds$12,204,768$12,204,768$12,204,768$36,614,304

The agency's justification

The DPS mission is critical to the State of Texas. All citizens benefit from the more efficient provision ofregulatory services, enforcement of laws, and safety of those traveling on Texas highways. The mission cannot be accomplished without strategically placed facilities with modem systems to set the conditions for success.

DPS Facilities Condition Assessment identified over $185 million in maintenance items required to ensure the efficient operations of DPS facilities throughout the state. DPS requests funding to address critical deferred maintenance projects, upgrade generators to expand redundant power generation capacity, and replace outdated underground fuel tanks to ensure DPS is ready for emergencies and normal operations.

DPS is requesting funding to construct new regional headquarters for El Paso and San Antonio. Both existing facilities limit the type and scope of operations required of DPS. With curren.t FTEs and square footage, there is limited space, nor is there a feasible way to expand the current building. In addition, DPS is requesting funding to construct a live threat engagement training house and SWAT facility to create realistic training to move tactically when entering schools, places of worship, businesses, and homes.

DPS leases more than 90 facilities that are essential to support law enforcement personnel and serve the citizens of Texas. The Texas Facilities Commission estimates renewal costs will increase, on average, by 25 percent on a one-time basis. Many DPS lease renewals are contractually tied to the Consumer Price Index for Urban Wage Earners and Clerical Workers (CPI-W) with a forecast of 4.5 percent increase per year. Additionally, Driver License Division (DLD) has two new unfunded leases for the Garland Mega Center and Leander/Cedar Park facility. DPS is requesting funds to pay lease costs increases and unfunded leases to maintain operations.

External and internal factors

For existing facilities, Texas taxpayers have invested hundreds of millions of dollars to provide DPS with facilities to execute its mission and achieve its goals. Addressing these critical life-safety and operational continuity issues, repairs, renewal of state-owned facilities and aging environmental and building systems statewide will ensure the agency continues to perform to the high level ofreliable protection and service to the citizens of Texas.

As marked in the request