Requests · Department of Transportation
AVN/FOD - Fund Fuel Farm and Facilities - Rehabilitation at TxDOT's Flight Services
Priority 3 · one of 7 items in the Department of Transportation's request for 2028-29 · The item begins on page 250 of the request
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $15,000,000 | $0 | $15,000,000 |
| Of which general revenue and general revenue-dedicated | $15,000,000 | $0 | $15,000,000 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $15,000,000 | $0 |
| Total, as the request prints it | $15,000,000 | $0 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 03-05-01 Support and Promote General AviationIn the current budget: C.5.1 AVIATION SERVICES | $15,000,000 | $0 | — | $144,556,675 | $145,775,730 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks this item as having no costs after 2029.
The agency's justification
TxDOT requests $15 million in general revenue for FY 2028 and UB Authority in FY 2029 to increase safety and replace outdated infrastructure at the state's Flight Services Facility.
Fuel Farm and Facility Rehabilitation: The 26-year-old aviation fuel farm with four, 12,000 gallon tanks has exceeded its useful life and requires replacement with modern infrastructure, increased capacity, and updated safety and monitoring technology to meet current operational and regulatory standards. Additionally, the facility requires the refurbishment of interior spaces for safety as well as the reconstruction of airport parking lot and aircraft ramp areas due to pavement deterioration and drainage deficiencies, requiring replacement with durable materials, improved markings, and updated stormwater features to enhance safety and operations.
General Revenue is the requested funding source because there are no other eligible sources available to the department. Limited, non-dedicated State Highway Fund dollars are used to operate current Public Transportation, Aviation, Rail, and Maritime programs and operations.
External and internal factors
These improvements will directly benefit passengers who use state aircraft facilities by providing a safer, more reliable, and more comfortable travel experience. Reconstructing the fuel farm with modern technology will strengthen safety controls and reduce the risk of fuel-related service disruptions. Parking lot, ramp, canopy, and interior improvements will improve passenger access, boarding, accessibility, and comfort, supporting a higher level of customer service for state agencies and university users. Together, these investments will improve the efficiency of Flight Services operations by supporting reliable fueling , better aircraft movement, safer ground access, and more dependable day-to-day service for passengers and flight crews.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: No
- Involves contracts over $50,000: No