Requests · Historical Commission
Texas Revolutionary and Republic State Historic Sites - Texas Revolutionary SHS - Presidio La Bahia SHS
Priority 4 · one of 21 items in the Historical Commission's request for 2028-29 · The item begins on page 153 of the request
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $50,000,000 | $0 | $50,000,000 |
| Of which general revenue and general revenue-dedicated | $50,000,000 | $0 | $50,000,000 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $50,000,000 | $0 |
| Total, as the request prints it | $50,000,000 | $0 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 01-01-04 Operation and Maintenance of Historic SitesIn the current budget: A.1.4 HISTORIC SITES | $50,000,000 | $0 | — | $49,778,855 | $24,978,650 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks this item as having no costs after 2029.
The agency's justification
This proposal integrates the former Stripling Workshop into the Visitor Center plan . Due to its poor condition, the structure would be demolished to the slab, with the historic façade preserved in new construction. Locating the Visitor Center north of the presidio may complicate visitor flow, as entry would occur through the unregulated “Watergate.” The plan adds parking east of the workshop while retaining existing spaces for peak demand. Site constraints limit expansion, and adjacent property conditions detract from the setting. Funding supports site redevelopment, including demolition, façade preservation, and new construction. Investment in parking and circulation improvements is needed to manage access and visitation. Additional resources address entry control and site aesthetics. A key cost and risk factor is land acquisition, as the property is jointly owned and not currently available for sale, making this option more complex than alternatives relying on land transfer.
External and internal factors
Physical site constraints, deteriorated existing structures, visitor circulation and entry-control limitations, parking needs, and uncertainty associated with acquisition of jointly owned adjacent property significantly affect redevelopment options and project cost. Investment is necessary to address these constraints while preserving historic character and providing safe, controlled, and functional visitor access to the site.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: No
- Involves contracts over $50,000: Yes