Requests · Juvenile Justice Department
Deferred Maintenance
Priority 3 · one of 15 items in the Juvenile Justice Department's request for 2028-29 · The item begins on page 182 of the request
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $40,590,000 | $0 | $40,590,000 |
| Of which general revenue and general revenue-dedicated | $40,590,000 | $0 | $40,590,000 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $40,590,000 | $0 |
| Total, as the request prints it | $40,590,000 | $0 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 02-01-03 Facility Supervision and Food ServiceIn the current budget: B.1.3 FACILITY SUPERVISION & FOOD SERVICE | $40,590,000 | $0 | — | $79,469,691 | $78,494,165 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks this item as having no costs after 2029.
The agency's justification
Keeps TJJD facilities operational. Investments address critical deficiencies in aging buildings and life-safety systems, including roofs, HVAC systems, plumbing, electrical systems, fire protection, bathrooms, and other essential infrastructure that directly supports safe and secure facility operations. Maintaining these systems reduces the risk of equipment failures, operational disruptions, security vulnerabilities, and emergency closures while protecting youth, staff, visitors, and state assets. Timely investment also extends the useful life of state facilities and reduces future repair and replacement costs.
External and internal factors
Internal Factors Many facility systems have reached or exceeded their useful life due to age and deferred maintenance.
Critical building systems require replacement or major repair to maintain safe, secure, and uninterrupted operations.
Agency priority to preserve state-owned assets and reduce the risk of operational disruptions and emergency repairs.
Need to maintain reliable infrastructure that supports youth programming, security, and daily facility operations.
Commitment to proactive asset management to reduce long-term maintenance and replacement costs.
External Factors Aging infrastructure continues to deteriorate, increasing the likelihood of equipment failures and service interruptions.
Escalating construction, labor, and material costs increase the cost of delaying repairs.
Building codes, life-safety requirements, and correctional standards require facilities to maintain safe and functional infrastructure.
Severe weather and environmental conditions accelerate deterioration of roofs, HVAC systems, plumbing, and other building components.
Public and legislative expectations require responsible stewardship of state assets and safe facilities for youth, employees, and visitors.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: No
- Involves contracts over $50,000: Yes