Requests · Library & Archives Commission

Restoration of 3% Mandatory GR Reduction

Priority 8 · one of 10 items in the Library & Archives Commission's request for 2028-29 · The item begins on page 129 of the request

This is a request, not an appropriation.

What is asked

20282029Two years
All funds$643,071$643,071$1,286,142
Of which general revenue and general revenue-dedicated $643,071$643,071$1,286,142
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$643,071$643,071
Total, as the request prints it$643,071$643,071

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
01-01-01 Assistance Provided to Texas LibrariesIn the current budget: A.1.1 LIBRARY SUPPORT SERVICES $393,071$393,071— $27,657,988 $23,429,649
02-01-01 Provide Access to Information and ArchivesIn the current budget: B.1.1 PROVIDE ACCESS TO INFO & ARCHIVES $250,000$250,000— $3,933,995 $4,080,395

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The agency's estimate203020312032Three years
All funds$643,071$643,071$643,071$1,929,213
Of which general revenue$643,071$643,071$643,071$1,929,213

In the agency's words: Restoration of 3% mandatory reduction in two of the agency's programs: 1.1.1 - Library Support Services ($393,071/yr) and 2.1.1 - Provide Archive & Info Services ($250,000/yr). All restored funds would be used to continue existing efforts in each of the programs . For Strategy 1.1.1., the restoration of funds would allow libraries throughout the state to continue providing public access to the e-resources procured with this funding. These licenses are contracted on a yearly basis, so annual funding is necessary to provide consistent and continued access to array of resources available through the program. For Strategy 2.1.1., the reinstated funding will allow the agency to continue contracts with the Texas Facilities Commission for critical repairs and maintenance projects at the Sam Houston Center and permit efficient and economical contracting and scheduling of road maintenance, construction and other larger projects.

The agency's justification

The two programs identified to implement the mandatory 3% are agency program areas that, while not affecting staffing or core administrative areas, impact statewide public access to information and historical records and assets. The amounts ascribed for the cuts represent a partial reduction in each program. The $393,071/ year targeted in agency's e-resource program (TexShare and TexQuest) affects agency performance measures that includes approximately $10,319,365 reduction in overall cost avoidance. Reduced capital funds for Sam Houston Regional Library and Research Center facility repairs and renovations will impede the agency’s ability to continue its efforts to address the deferred maintenance of buildings on the nearly 50-year-old campus, including the 17,000 square foot research center, the Jean and Governor Price Daniel Home and Archives, and several historical buildings. The $250,000 funding (half of the current allocation for this item) is significant as it is the only funding the agency has available at this time to continue the significant and longstanding work to revitalize and preserve the historical properties. This work is needed to allow public access of these sites, which are educational resources for learning about Texas history.

External and internal factors

E-resource collections represent the most costly resources for libraries, so a reduction not only represents a reduction of resources available, but also effectively means that (given the excellent pricing the agency is able to negotiate) local libraries would likely not be able to procure these licenses on their own.

The Sam Houston Regional Library and Research Center located in Liberty will celebrate its 50th anniversary in May 2027. A reduction in the funds appropriated for the deferred maintenance of buildings on the nearly 50-year-old campus, including the 17,000 square foot research center, the Jean and Governor Price Daniel Home and Archives, and several historical buildings, will impede the agency’s ability to revitalize and preserve the historical properties. The $250,000 funding (half of the current allocation for this item) is significant as it is the only funding the agency has available at this time to continue the necessary and longstanding work needed to allow public to safely and conveniently access these sites. The agency contracts with the Texas Facilities Commission for the repairs and maintenance. A reduction in the current allocation for this item may require additional efforts in contracting and delay scheduling for larger projects such road maintenance and resurfacing , which may increase costs.

As marked in the request