Requests · Military Department

Continuing Camp Bowie Training Center Upgrades

Priority 8 · one of 16 items in the Military Department's request for 2028-29 · The item begins on page 108 of the request

This is a request, not an appropriation.

What is asked

20282029Two years
All funds$5,000,000$43,700,000$48,700,000
Of which general revenue and general revenue-dedicated $5,000,000$43,700,000$48,700,000
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$5,000,000$43,700,000
Total, as the request prints it$5,000,000$43,700,000

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
02-01-01 Facilities Management and OperationsIn the current budget: B.1.1 FACILITIES MANAGEMENT & OPERATIONS $5,000,000$43,700,000— $96,124,809 $95,197,165

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The request marks costs as anticipated after 2029 and shows no cost for 2030, 2031 or 2032.

In the agency's words: No out-year operating costs are expected during FY2030 FY2032. If funded, the Camp Bowie upgrades are expected to become operational beginning in FY2033. Post-construction facility sustainment, operations, utilities, maintenance, and lifecycle replacement will require ongoing support and are anticipated to receive federal funding under applicable support agreements.

The agency's justification

TMD requests $48,700,000 to upgrade Camp Bowie State Training Center in Brownwood. The request funds the design and construction of four new barracks, a dining facility, an entry control point, a military vehicle motor pool, and supporting roads, parking, utilities, and infrastructure. These improvements replace deteriorated temporary facilities, improve troop billeting and feeding capacity, provide controlled access and force protection, and create a more functional platform for vehicle staging, training, mobilization, and emergency response support. Camp Bowie is one of TMD's four large-scale training centers, its second most utilized training site, and the only major center with a significant portion of its facilities on state-owned land. It supports Texas Army National Guard training, pre-mobilization training, Operation Lone Star pre-deployment training, and emergency response operations. In 2008, TMD purchased 32 temporary barracks for 1,024 beds to meet increased operational tempo; sixteen have since closed due to health and safety concerns, including structural degradation and mold, leaving remaining beds overcrowded. Without replacement facilities, bed capacity is projected to decline further, limiting Camp Bowie during periods of high training demand. The upgrades also strengthen TXARNG competitiveness to secure $46M in federal ERCIP funding for an integrated energy and water smart grid, demonstrating that Texas is ready to invest in this critical training site.

External and internal factors

If unfunded, Camp Bowie will continue losing usable training-site capacity as temporary facilities age beyond their lifecycle. Sixteen of 32 temporary barracks have already closed due to health and safety issues, including structural degradation and mold, and remaining serviceable beds are compressed into overcrowded space, reducing billeting capacity and quality of life and limiting the number and type of units that can train. Camp Bowie totaled 1,368,879 soldier-days of training throughput from January 2007 to June 2026, with high-tempo years exceeding 100,000 soldier-days; since 2023 it has supported 74 pre-mobilization training events and 84 Operation Lone Star pre-deployment and quarterly weapon qualification events (per RFMSS data). Failure to modernize places this throughput at risk. Externally, the State will have less dependable access to a Texas-owned platform for training, staging, and mobilization when the Guard is needed for disaster response, border security, or civil disturbance. Not funding this item would delay the Camp Bowie Master Development Plan, extend reliance on failing temporary barracks, and leave a critical state training site without the modern facilities required for current and future missions.

As marked in the request