| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $16,108,252 | $34,486,975 | $50,595,227 |
| Of which general revenue and general revenue-dedicated | $16,108,252 | $34,486,975 | $50,595,227 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $16,108,252 | $34,486,975 |
| Total, as the request prints it | $16,108,252 | $34,486,975 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 02-01-01 Facilities Management and OperationsIn the current budget: B.1.1 FACILITIES MANAGEMENT & OPERATIONS | $16,108,252 | $34,486,975 | — | $96,124,809 | $95,197,165 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks costs as anticipated after 2029 and shows no cost for 2030, 2031 or 2032.
In the agency's words: Phase 2 and Phase 3 preservation and construction costs are anticipated following completion of Phase 1, along with ongoing facility sustainment and operating costs. Future phases will continue the phased restoration and modernization of historic Camp Mabry facilities while maintaining mission continuity.
The agency's justification
TMD requests $50,600,000 in FY 2028–29 for the Camp Mabry Historic District Preservation Phase 1 Capital Budget project. The request supports Strategy B.1.1, Facilities Management and Operations, and advances TMD Strategic Goals 1 and 3: Enhance Responsiveness and Secure Texas. Phase 1 funds assessment, planning, and design for Buildings 6, 10, 14, 15, and 17; major restoration construction for Building 15; and design and construction of Building 17, a new 24,000 SF facility supporting the TMD Office of State Administration that enables phased movement while historic facilities are restored. Scope includes historic preservation assessment, design, modern code compliance, security and life-safety systems, hazardous materials assessment and removal, building systems modernization, construction, commissioning, and related project support. Camp Mabry Historic District is a living military campus, not a static monument. Established in 1892, it remains the operational headquarters of TMD, the largest state military force in the United States. Buildings 10, 11, 14, and 15 are some of the only remaining World War I-era barracks along the historic parade ground, and Building 6, the original mess hall, now houses the Texas Military Forces Museum. Funding Phase 1 protects irreplaceable state-owned historic assets, sustains mission continuity during a multi-phase restoration program, and ensures TMD can safely operate critical headquarters facilities through the Texas Bicentennial period and beyond.
External and internal factors
If unfunded, TMD will continue relying on aging historic buildings that require major restoration and modernization to remain safe, functional, and resilient. Deferring Phase 1 increases the risk of facility deterioration, higher future restoration costs, unplanned outages, life-safety and code-compliance issues, and operational disruption at TMD headquarters. Internally, failure to fund would delay the enabling construction and sequencing needed to relocate occupants and functions while historic facilities are restored. Building 17 is essential to create swing and permanent administrative space for OSA mission-critical functions, reduce reliance on improvised space, and limit disruption to daily headquarters operations. Without early design for Buildings 6, 10, 14, 15, and 17, TMD cannot scope, bid, and sequence later construction phases. Externally, the State risks degradation of a unique public asset: an active historic installation supporting readiness, emergency response, Soldier and Airman administration, and museum and education functions. Funding Phase 1 allows TMD to begin a disciplined, phased preservation program, control execution risk, protect historically significant facilities, and maintain mission continuity while modernizing the district into safe, effective, and resilient facilities.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: Yes
- Involves contracts over $50,000: Yes