Critical Deferred Maintenance
Priority 2 · one of 3 items in the Preservation Board's request for 2028-29 · The item begins on page 108 of the request
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $31,800,000 | $0 | $31,800,000 |
| Of which general revenue and general revenue-dedicated | $31,800,000 | $0 | $31,800,000 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $31,800,000 | $0 |
| Total, as the request prints it | $31,800,000 | $0 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 01-01-02 Maintain State Capitol and Other Designated Buildings and GroundsIn the current budget: A.1.2 BUILDING MAINTENANCE | $21,000,000 | $0 | — | $7,740,702 | $7,931,811 |
| 01-02-02 Manage and Operate the Bob Bullock Texas State History MuseumIn the current budget: A.2.2 MANAGE STATE HISTORY MUSEUM | $10,800,000 | $0 | — | $5,443,367 | $1,943,367 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks costs as anticipated after 2029 and shows no cost for 2030, 2031 or 2032.
The agency's justification
The request is to upgrade and replace aging and increasing unreliable fire alarm systems that create increase maintenance needs and operational risks to state investments.
External and internal factors
Age and reliability of current fire alarm systems, the need to protect visitors, staff, exhibits, and irreplaceable historical collections, and the operational disruptions associated with system failures.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: Yes
- Involves contracts over $50,000: Yes