What is asked

20282029Two years
All funds$577,875$577,875$1,155,750
Of which general revenue and general revenue-dedicated $577,875$577,875$1,155,750
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$577,875$577,875
Total, as the request prints it$577,875$577,875

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
03-01-01 Oil and Gas Monitoring and InspectionsIn the current budget: C.1.1 OIL/GAS MONITOR & INSPECTIONS $577,875$577,875— $35,310,146 $35,646,776

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The agency's estimate203020312032Three years
All funds$577,875$577,875$577,875$1,733,625

In the agency's words: These costs include the for the Quanta Mears and for the Texas A&M Engineering Extension (TEEX) training contract.

The agency's justification

89th Texas Legislature, House Bill 143 required changes to Texas Administrative Code (TAC), Title 16, Part 1, Chapter 3, Rule 3.21. RRC Inspectors are now required to inspect an operators compliance to “construct, operate, and maintain an electrical power line serving a well site or other surface facility employed in operations incident to oil and gas development and production in accordance with the National Electrical Code published by the National Fire Protection Association and adopted by the Texas Department of Licensing and Regulation in §73.100 of this title (relating to Technical Requirements)" per Statewide Rule (SWR) 3.21(l). The additional inspection requirements created the need to properly train field inspectors in fire prevention and electrical standards and safety. Texas A&M Engineering Extension (TEEX) provides training for electrical standards and safety and Quanta Mears is proposed to be contracted to facilitate the fire prevention training. As of April 2026, the O&G Division has 179 inspectors that will be required to complete these training requirements. As the agency hires new inspectors each month, they will also require training. TEEX training includes the following courses: Electrical Standards (OSHA #3095); 31.00 Hours, Lockout/Tagout (OSHA #7115); 8 Hours, Electrical Transmission and Distribution; 10 Hours, and Electrical Safety for Utility Personnel (Online); 2 Hours. The annual cost estimate for the TEEX contract is $228,825. Quanta Mears is proposed to facilitate fire prevention training for the same inspectors to enable them to complete their inspections per SWR 21(l). The annual cost estimate is $274,050 per year (9 trainings per year at $30,450 per training). This training is conducted in a field environment and will require travel of all participants.

External and internal factors

External Factors: Following the 89th Texas Legislature, House Bill 143 required changes to Texas Administrative Code (TAC), Title 16, Part 1, Chapter 3, Rule 3.21. RRC Inpectors are now required to inspect an operators compliance to "construct, operate, and maintain an electrical power line serving a well site or other surface facility employed in operations incident to oil and gas development and production in accordance with the National Electrical Code published by the National Fire Protection Association and adopted by the Texas Department of Licensing and Regulation in §73.100 of this title (relating to Technical Requirements)" per Statewide Rule (SWR)

3.21(l).

As marked in the request