Requests · Soil and Water Conservation Board
Restoration of 3% Base Appropriations Reduction
Priority 1 · one of 6 items in the Soil and Water Conservation Board's request for 2028-29 · The item begins on page 59 of the request
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $1,366,831 | $1,366,830 | $2,733,661 |
| Of which general revenue and general revenue-dedicated | $1,366,831 | $1,366,830 | $2,733,661 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $1,366,831 | $1,366,830 |
| Total, as the request prints it | $1,366,831 | $1,366,830 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 01-01-01 Program Expertise, Financial & Conservation Implementation AssistanceIn the current budget: A.1.1 PROGRAM MANAGEMENT & ASSISTANCE | $16,500 | $16,500 | — | $20,053,775 | $20,053,775 |
| 01-01-02 On The Ground Conservation Program | $21,500 | $21,500 | — | No strategy matched in the current budget | |
| 01-02-01 Flood Control Dam Maintenance, Operations and EngineeringIn the current budget: A.2.1 FLOOD CONTROL DAM MAINTENANCE | $8,625 | $8,625 | — | $15,046,393 | $15,001,393 |
| 01-02-02 Flood Control Dam ConstructionIn the current budget: A.2.2 FLOOD CONTROL DAM CONSTRUCTION | $1,000,000 | $1,000,000 | — | $32,558,819 | $32,558,819 |
| 02-01-01 Implement a Statewide Management Plan for Controlling NPS PollutionIn the current budget: B.1.1 STATEWIDE MANAGEMENT PLAN | $40,000 | $40,000 | — | $4,624,600 | $4,624,600 |
| 02-01-02 Water Quality Management Plans for Problem Agricultural AreasIn the current budget: B.1.2 WATER QUALITY MANAGEMENT PLANS | $137,854 | $137,854 | — | $5,370,500 | $5,370,500 |
| 03-01-02 Vegetative Management | $135,352 | $135,352 | — | No strategy matched in the current budget | |
| 04-01-01 Indirect AdministrationIn the current budget: D.1.1 INDIRECT ADMINISTRATION | $7,000 | $6,999 | — | $996,750 | $996,750 |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks this item as having no costs after 2029.
The agency's justification
The Texas State Soil and Water Conservation Board is respectfully requesting consideration of an exceptional item request to restore the three percent base appropriation reduction. This request restores funding for technology and equipment replacements deferred for 2028-29 biennium, travel reductions, and reductions to programmatic grants and services.
External and internal factors
Approximately ninety percent of all funding appropriated to the Board is provided directly to the end users of agency programs, with approximately eight percent funding technical staff for program oversight and guidance, and two percent for agency administration.
As marked in the request
- Has an information technology part: Yes
- Costs anticipated after the two budget years: No
- Involves contracts over $50,000: Yes