Requests · Soil and Water Conservation Board

Continued Elimination of Backlog of High Hazard Flood Control Dam Rehabilitation, Upgrade, and/or Repair Needs.

Priority 3 · one of 6 items in the Soil and Water Conservation Board's request for 2028-29 · The item begins on page 63 of the request

This is a request, not an appropriation.

What is asked

20282029Two years
All funds$150,000,000$0$150,000,000
Of which general revenue and general revenue-dedicated $150,000,000$0$150,000,000
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$150,000,000$0
Total, as the request prints it$150,000,000$0

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
01-02-02 Flood Control Dam ConstructionIn the current budget: A.2.2 FLOOD CONTROL DAM CONSTRUCTION $150,000,000$0— $32,558,819 $32,558,819

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The request marks this item as having no costs after 2029.

The agency's justification

A request to increase funding in Strategy A.2.2, Flood Control Dam Construction, to address the existing $4 billion (estimated) backlog of rehabilitation needs. This is a continuation of efforts to reduce the number of flood control dams that were designed at low hazard criteria in the past, but have since been redesignated to high hazard due to development, and as such, are now considered deficient. These dams require “rehabilitation,” which is the process of upgrading design and construction of dam to meet present criteria when federal dollars are available to cover 65% of the total cost of a job. In the absence of federal funding, the agency refers to this process as an “upgrade.” Additionally, there are known repair needs that are not related to hazard classification.

External and internal factors

There is currently at least $4 billion in total rehabilitation needs. This funding would accelerate the agency’s efforts to eliminate the backlog beyond the pace made possible under the base funding amount of $25 million per year.

As marked in the request