Requests · Texas State University
ALERRT Expansion Phase II
Priority 6 · one of 9 items in the Texas State University's request for 2028-29 · the item begins on page 96 of the PDF listed at the Legislative Budget Board's page for this filing
This is a request, not an appropriation.
What is asked
| 2028 | 2029 | Two years | |
|---|---|---|---|
| All funds | $5,000,000 | $20,000,000 | $25,000,000 |
| Of which general revenue and general revenue-dedicated | $5,000,000 | $20,000,000 | $25,000,000 |
| Positions (full-time equivalents) | — | — |
How it would be financed
| Method of financing, as the request prints it | 2028 | 2029 |
|---|---|---|
| 1 General Revenue Fund | $5,000,000 | $20,000,000 |
| Total, as the request prints it | $5,000,000 | $20,000,000 |
Where it would land
The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.
| Strategy | Asked 2028 | Asked 2029 | Positions | Appropriated 2026 | Appropriated 2027 |
|---|---|---|---|---|---|
| 03-01-02 Advanced Law Enforcement Rapid Response Training | $5,000,000 | $20,000,000 | — | No strategy matched in the current budget | |
A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.
After 2029
The request marks this item as having no costs after 2029.
The agency's justification
The Advanced Law Enforcement Rapid Response Training (ALERRT) Center at Texas State University is experiencing significant growth and requires additional facilities to meet the increasing national demand for training, education, and research supporting law enforcement officers, first responders, and hospital emergency personnel. Located on a 75-acre site near the San Marcos Regional Airport at 1285 William Pettus Road, recently conveyed by the federal government to Texas State University for this purpose, the ALERRT Center serves as a nationally recognized resource for active attack response training, law enforcement best practices, and related research.
To support continued growth and expand training capacity, Phase II development of the ALERRT Center includes construction of a bunkhouse/residence hall; law enforcement driver training track; dining facilities; and ongoing additions and modifications to existing training venues to accommodate a variety of active shooter and emergency response scenarios. Additional project elements indoor and outdoor shooting range expansions and improvements, parking and roadway enhancements, utility and stormwater infrastructure upgrades, perimeter security fencing, controlled site access, restroom facilities, and other site improvements necessary to support year-round operations and strengthen the Center's ability to serve law enforcement and emergency response professionals across Texas and the nation.
Phase I, funded in the previous biennium and currently under construction, included a 12,000-square- foot administrative building with office and conference space for 30 to 40 employees; a 20,000-square-foot climate-controlled logistics warehouse to support the storage, shipping, and distribution of training equipment nationwide.
External and internal factors
Expansion of the ALERRT Center will require the extension and enhancement of utility infrastructure, including water, wastewater, electrical, and fiber communications services to support planned new and upgraded facilities. Additional stormwater detention and drainage improvements may be necessary to accommodate site development and ensure regulatory compliance. The project will also require roadway improvements to support increased traffic and accessibility around the site. Included in the scope is a law enforcement driving track. Facility enhancements include safety and regulatory upgrades to training ranges, including bullet containment systems and other protective 94 90th Regular Session, Agency Submission, Version 1 TIME: 11:30:48AM measures necessary to meet applicable standards. Planned indoor range improvements will be designed and constructed in accordance with all applicable safety, environmental, and regulatory requirements.
As marked in the request
- Has an information technology part: No
- Costs anticipated after the two budget years: No
- Involves contracts over $50,000: Yes