Requests · The University of Texas at Austin

CCAP - Frontiers of Science Building

Priority 2 · one of 3 items in the The University of Texas at Austin's request for 2028-29 · The item begins on page 134 of the request

This is a request, not an appropriation.

What is asked

20282029Two years
All funds$13,080,000$13,080,000$26,160,000
Of which general revenue and general revenue-dedicated $13,080,000$13,080,000$26,160,000
Positions (full-time equivalents) ——

How it would be financed

Method of financing, as the request prints it20282029
1 General Revenue Fund$13,080,000$13,080,000
Total, as the request prints it$13,080,000$13,080,000

Where it would land

The strategies this item would add to, numbered as the request numbers them, beside what each is appropriated in the current budget (2026-27 Act). One column is an appropriation and the other a request made on top of a base request not shown here, so the two are not subtracted.

Strategy Asked 2028Asked 2029Positions Appropriated 2026Appropriated 2027
02-01-02 Capital Construction Assistance Projects Revenue Bonds $13,080,000$13,080,000—No strategy matched in the current budget

A strategy is matched by its name. Where none is matched, the strategy may be new, or may be in the current budget under a different name.

After 2029

The agency's estimate203020312032Three years
All funds$13,080,000$13,080,000$13,080,000$39,240,000

In the agency's words: Debt assumptions: $150,000,000 CCAP with an interest rate of 6% annualized over a twenty year period.

The agency's justification

UT Austin’s request for Capital Construction Assistance Project (CCAP) support will allow the institution to construct the Frontiers of Science Building to be the modern lab center of interdisciplinary discovery and innovation, elevating Materials Science as the field that connects and fosters collaboration across engineering, physical sciences, computation, and applied research. The Frontiers of Science Building will be located at the corner of Speedway and Dean Keeton on the existing Chemical and Petroleum Engineering (CPE) Building site.

The project includes design and construction of the new collaborative facility and would total approximately 475,000 gross square feet. As a foundational discipline, Materials Science underpins innovation across numerous domains, including energy systems, advanced manufacturing, semiconductors, nanotechnology, and life sciences. The building will be designed to encourage interaction, shared use of resources, and collaboration across departments, enabling discovery that spans scales from fundamental research to applied innovation.

External and internal factors

CCAP authorization will advance the long term academic and research strategy of the institution by investing in interdisciplinary infrastructure that enable discovery at scale . The total estimated cost of the 475,000 GSF facility is $810 million, of which UT Austin is requesting $150 million in CCAP support from the state.

Debt assumptions: $150,000,000 CCAP with an interest rate of 6% annualized over a twenty year period.

As marked in the request