Agencies · Article VII: Business and Economic Development

Department of Transportation

Total, all funds · 2026-27 Act
+$2,608,445,516 (+7.0%) since 2024-25 Act
Total through the session
2024-25 Act → 2026-27 Act

2028-29 request. This agency asked for 7 items above its baseline, $104,000,000 in all funds. That is a request, not an appropriation. What it asked for

Money

Change by strategy, 2024-25 Act → 2026-27 Act
-$1.0B$0$1.0B$2.0BA.1.5 MAINTENANCE CONTRACTS: +$1,346,976,213A.1.5 MAINTENANCE CONTRACTS+$1.3BA.1.6 PROPOSITION 1, 2014: +$1,128,945,000A.1.6 PROPOSITION 1, 2014+$1.1BA.1.7 PROPOSITION 7, 2015: +$1,022,360,818A.1.7 PROPOSITION 7, 2015+$1.0BA.1.3 RIGHT-OF-WAY ACQUISITION: -$750,862,983A.1.3 RIGHT-OF-WAYACQUISITION-$750.9MA.1.8 CONSTRUCTION GRANTS & SERVICES: -$578,652,637A.1.8 CONSTRUCTION GRANTS &SERVICES-$578.7MB.1.1 CONTRACTED ROUTINE MAINTENANCE: +$505,244,587B.1.1 CONTRACTED ROUTINEMAINTENANCE+$505.2MA.1.4 CONSTRUCTION CONTRACTS: -$491,053,264A.1.4 CONSTRUCTION CONTRACTS-$491.1MA.1.1 PLAN/DESIGN/MANAGE: +$216,396,755A.1.1 PLAN/DESIGN/MANAGE+$216.4MB.1.2 ROUTINE MAINTENANCE: +$209,297,523B.1.2 ROUTINE MAINTENANCE+$209.3MH.1.1 SALARY ADJUSTMENTS: -$138,596,433 (discontinued)H.1.1 SALARY ADJUSTMENTS-$138.6M (discontinued)G.1.4 CONSTRUCTION CONTRACTS - SUBACCOUNT: +$127,000,000G.1.4 CONSTRUCTION CONTRACTS- SUBACCOUNT+$127.0ME.1.2 INFORMATION RESOURCES: +$58,126,752E.1.2 INFORMATION RESOURCES+$58.1M

The 12 largest of 28 changes are drawn. Bars right of the line are increases, left are decreases, each labelled with its amount. Strategies under review in either version, or carrying an unexpended balance (UB, an amount the bill does not state), are left out. The table below holds every figure.

Each figure opens the page of the bill it was read from.

Through the session
A.1.1 PLAN/DESIGN/MANAGE $1,353,908,733 $669,266,228 $684,642,505 $0 +$216,396,755
A.1.2 CONTRACTED PLANNING AND DESIGN $1,287,277,943 $653,153,513 $634,124,430 $0 -$19,023,624
A.1.3 RIGHT-OF-WAY ACQUISITION $1,019,197,306 $491,783,906 $527,413,400 $0 -$750,862,983
A.1.4 CONSTRUCTION CONTRACTS $3,926,446,631 $2,087,689,004 $1,838,757,627 $0 -$491,053,264
A.1.5 MAINTENANCE CONTRACTS $7,050,756,719 $3,627,118,283 $3,423,638,436 $0 +$1,346,976,213
A.1.6 PROPOSITION 1, 2014 $7,997,058,000 $4,452,504,000 $3,544,554,000 $0 +$1,128,945,000
A.1.7 PROPOSITION 7, 2015 $6,925,208,818 $3,484,665,894 $3,440,542,924 $0 +$1,022,360,818
A.1.8 CONSTRUCTION GRANTS & SERVICES $464,519,119 $366,499,140 $98,019,979 $0 -$578,652,637
B.1.1 CONTRACTED ROUTINE MAINTENANCE $2,890,653,800 $1,582,355,114 $1,308,298,686 $0 +$505,244,587
B.1.2 ROUTINE MAINTENANCE $2,325,748,621 $1,275,626,254 $1,050,122,367 $0 +$209,297,523
B.1.3 FERRY OPERATIONS $130,932,713 $64,376,484 $66,556,229 $0 +$26,259,041
C.1.1 PUBLIC TRANSPORTATION $288,884,977 $141,635,855 $147,249,122 $0 +$17,237,848
C.2.1 TRAFFIC SAFETY $143,482,688 $70,454,737 $73,027,951 $0 +$16,202,168
C.3.1 TRAVEL INFORMATION $44,911,954 $22,056,097 $22,855,857 $0 +$4,318,077
C.4.1 RESEARCH $60,014,571 $30,437,520 $29,577,051 $0 +$5,332,719
C.5.1 AVIATION SERVICES $290,332,405 $144,556,675 $145,775,730 $0 -$54,906,803
C.6.1 GULF WATERWAY $2,676,386 $1,330,668 $1,345,718 $0 +$486,872
D.1.1 RAIL PLAN/DESIGN/MANAGE $7,410,750 $3,705,375 $3,705,375 $0 +$336,550
D.1.2 CONTRACT RAIL PLAN/DESIGN $7,000,000 $3,500,000 $3,500,000 $0 $0
D.1.3 RAIL CONSTRUCTION $10,000,000 $10,000,000 $0 $0 -$4,929,788
D.1.4 RAIL SAFETY $3,488,195 $1,711,259 $1,776,936 $0 +$1,072,077
E.1.1 CENTRAL ADMINISTRATION $246,522,119 $126,841,500 $119,680,619 $0 +$20,470,540
E.1.2 INFORMATION RESOURCES $613,595,028 $310,146,973 $303,448,055 $0 +$58,126,752
E.1.3 OTHER SUPPORT SERVICES $116,282,038 $57,289,500 $58,992,538 $0 +$19,216,508
F.1.1 GENERAL OBLIGATION BONDS $522,000,000 $264,000,000 $258,000,000 $0 -$29,000,000
F.1.2 STATE HIGHWAY FUND BONDS $842,000,000 $420,000,000 $422,000,000 $0 +$4,000,000
F.1.3 TEXAS MOBILITY FUND BONDS $761,000,000 $416,000,000 $345,000,000 $0 -$53,809,000
F.1.4 OTHER DEBT SERVICE $1,000,000 $500,000 $500,000 $0 $0
G.1.1 PLAN/DESIGN/MANAGE - SUBACCOUNT $9,000,000 $4,500,000 $4,500,000 $0 $0
G.1.2 CONTRACTED PLAN/DESIGN - SUBACCOUNT $8,000,000 $4,000,000 $4,000,000 $0 $0
G.1.3 RIGHT-OF-WAY - SUBACCOUNT $25,000,000 $12,500,000 $12,500,000 $0 $0
G.1.4 CONSTRUCTION CONTRACTS - SUBACCOUNT $550,000,000 $400,000,000 $150,000,000 $0 +$127,000,000
H.1.1 SALARY ADJUSTMENTS — — -$138,596,433 discontinued
Grand total $39,924,309,514 $21,200,203,979 $18,724,105,535 +$2,608,445,516
Every version, figure by figure
Strategy 2024-25 Act 2024-25 Introduced (Senate) 2026-27 Introduced (House) 2026-27 Senate substitute 2026-27 House substitute 2026-27 House passed 2026-27 Conference 2026-27 2026-27 Act 2026-27
A.1.1 PLAN/DESIGN/MANAGE $1,137,511,978 $562,075,390 $575,436,588 $1,353,908,733 $669,266,228 $684,642,505 $1,353,908,733 $669,266,228 $684,642,505 $1,353,908,733 $669,266,228 $684,642,505 $1,356,908,733 $672,266,228 $684,642,505 $1,356,908,733 $672,266,228 $684,642,505 $1,353,908,733 $669,266,228 $684,642,505 $1,353,908,733 $669,266,228 $684,642,505
A.1.2 CONTRACTED PLANNING AND DESIGN $1,306,301,567 $648,984,617 $657,316,950 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430 $1,287,277,943 $653,153,513 $634,124,430
A.1.3 RIGHT-OF-WAY ACQUISITION $1,770,060,289 $856,947,062 $913,113,227 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400 $1,019,197,306 $491,783,906 $527,413,400
A.1.4 CONSTRUCTION CONTRACTS $4,417,499,895 $2,225,258,436 $2,192,241,459 $3,893,046,631 $2,054,289,004 $1,838,757,627 $3,893,046,631 $2,054,289,004 $1,838,757,627 $3,903,046,631 $2,064,289,004 $1,838,757,627 $3,893,046,631 $2,054,289,004 $1,838,757,627 $3,893,046,631 $2,054,289,004 $1,838,757,627 $3,926,446,631 $2,087,689,004 $1,838,757,627 $3,926,446,631 $2,087,689,004 $1,838,757,627
A.1.5 MAINTENANCE CONTRACTS $5,703,780,506 $2,653,543,733 $3,050,236,773 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436 $7,050,756,719 $3,627,118,283 $3,423,638,436
A.1.6 PROPOSITION 1, 2014 $6,868,113,000 $3,319,218,000 $3,548,895,000 $7,887,116,503 $5,078,019,503 $2,809,097,000 $7,887,116,503 $5,078,019,503 $2,809,097,000 $7,997,058,000 $4,452,504,000 $3,544,554,000 $7,997,058,000 $4,452,504,000 $3,544,554,000 $7,997,058,000 $4,452,504,000 $3,544,554,000 $7,997,058,000 $4,452,504,000 $3,544,554,000 $7,997,058,000 $4,452,504,000 $3,544,554,000
A.1.7 PROPOSITION 7, 2015 $5,902,848,000 $2,924,896,000 $2,977,952,000 $7,498,401,512 $3,717,787,561 $3,780,613,951 $7,498,401,512 $3,717,787,561 $3,780,613,951 $6,925,208,818 $3,484,665,894 $3,440,542,924 $6,925,208,818 $3,484,665,894 $3,440,542,924 $6,925,208,818 $3,484,665,894 $3,440,542,924 $6,925,208,818 $3,484,665,894 $3,440,542,924 $6,925,208,818 $3,484,665,894 $3,440,542,924
A.1.8 CONSTRUCTION GRANTS & SERVICES $1,043,171,756 $733,124,258 $310,047,498 $454,519,119 $356,499,140 $98,019,979 $454,519,119 $356,499,140 $98,019,979 $454,519,119 $356,499,140 $98,019,979 $464,519,119 $366,499,140 $98,019,979 $464,519,119 $366,499,140 $98,019,979 $464,519,119 $366,499,140 $98,019,979 $464,519,119 $366,499,140 $98,019,979
B.1.1 CONTRACTED ROUTINE MAINTENANCE $2,385,409,213 $1,318,200,957 $1,067,208,256 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686 $2,890,653,800 $1,582,355,114 $1,308,298,686
B.1.2 ROUTINE MAINTENANCE $2,116,451,098 $1,049,598,357 $1,066,852,741 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367 $2,325,748,621 $1,275,626,254 $1,050,122,367
B.1.3 FERRY OPERATIONS $104,673,672 $51,378,817 $53,294,855 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229 $130,932,713 $64,376,484 $66,556,229
C.1.1 PUBLIC TRANSPORTATION $271,647,129 $134,924,775 $136,722,354 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122 $288,884,977 $141,635,855 $147,249,122
C.2.1 TRAFFIC SAFETY $127,280,520 $63,453,462 $63,827,058 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951 $143,482,688 $70,454,737 $73,027,951
C.3.1 TRAVEL INFORMATION $40,593,877 $19,295,087 $21,298,790 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857 $44,911,954 $22,056,097 $22,855,857
C.4.1 RESEARCH $54,681,852 $27,517,742 $27,164,110 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051 $60,014,571 $30,437,520 $29,577,051
C.5.1 AVIATION SERVICES $345,239,208 $206,239,888 $138,999,320 $315,832,405 $170,056,675 $145,775,730 $309,832,405 $164,056,675 $145,775,730 $309,832,405 $164,056,675 $145,775,730 $309,832,405 $164,056,675 $145,775,730 $309,832,405 $164,056,675 $145,775,730 $290,332,405 $144,556,675 $145,775,730 $290,332,405 $144,556,675 $145,775,730
C.6.1 GULF WATERWAY $2,189,514 $1,090,973 $1,098,541 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718 $2,676,386 $1,330,668 $1,345,718
D.1.1 RAIL PLAN/DESIGN/MANAGE $7,074,200 $3,463,600 $3,610,600 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375 $7,410,750 $3,705,375 $3,705,375
D.1.2 CONTRACT RAIL PLAN/DESIGN $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000 $7,000,000 $3,500,000 $3,500,000
D.1.3 RAIL CONSTRUCTION $14,929,788 $12,464,894 $2,464,894 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $10,000,000 $0 $10,000,000 $10,000,000 $0
D.1.4 RAIL SAFETY $2,416,118 $1,208,059 $1,208,059 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936 $3,488,195 $1,711,259 $1,776,936
E.1.1 CENTRAL ADMINISTRATION $226,051,579 $114,672,340 $111,379,239 $241,522,119 $121,841,500 $119,680,619 $241,522,119 $121,841,500 $119,680,619 $241,522,119 $121,841,500 $119,680,619 $241,522,119 $121,841,500 $119,680,619 $241,522,119 $121,841,500 $119,680,619 $246,522,119 $126,841,500 $119,680,619 $246,522,119 $126,841,500 $119,680,619
E.1.2 INFORMATION RESOURCES $555,468,276 $278,101,752 $277,366,524 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055 $613,595,028 $310,146,973 $303,448,055
E.1.3 OTHER SUPPORT SERVICES $97,065,530 $48,133,862 $48,931,668 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538 $116,282,038 $57,289,500 $58,992,538
F.1.1 GENERAL OBLIGATION BONDS $551,000,000 $278,000,000 $273,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000 $522,000,000 $264,000,000 $258,000,000
F.1.2 STATE HIGHWAY FUND BONDS $838,000,000 $419,000,000 $419,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000 $842,000,000 $420,000,000 $422,000,000
F.1.3 TEXAS MOBILITY FUND BONDS $814,809,000 $399,209,000 $415,600,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000 $761,000,000 $416,000,000 $345,000,000
F.1.4 OTHER DEBT SERVICE $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 $500,000
G.1.1 PLAN/DESIGN/MANAGE - SUBACCOUNT $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000 $9,000,000 $4,500,000 $4,500,000
G.1.2 CONTRACTED PLAN/DESIGN - SUBACCOUNT $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000 $8,000,000 $4,000,000 $4,000,000
G.1.3 RIGHT-OF-WAY - SUBACCOUNT $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000 $25,000,000 $12,500,000 $12,500,000
G.1.4 CONSTRUCTION CONTRACTS - SUBACCOUNT $423,000,000 $211,500,000 $211,500,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000 $550,000,000 $400,000,000 $150,000,000
H.1.1 SALARY ADJUSTMENTS $138,596,433 $45,853,490 $92,742,943———————
Grand total $37,315,863,998 $18,632,354,551 $18,683,509,447 $40,354,660,711 $22,025,941,149 $18,328,719,562 $40,348,660,711 $22,019,941,149 $18,328,719,562 $39,895,409,514 $21,171,303,979 $18,724,105,535 $39,898,409,514 $21,174,303,979 $18,724,105,535 $39,898,409,514 $21,174,303,979 $18,724,105,535 $39,924,309,514 $21,200,203,979 $18,724,105,535 $39,924,309,514 $21,200,203,979 $18,724,105,535

Method of financing

Fund group 2024-25 Act 2024-25 Introduced (Senate) 2026-27 Introduced (House) 2026-27 Senate substitute 2026-27 House substitute 2026-27 House passed 2026-27 Conference 2026-27 2026-27 Act 2026-27
General Revenue $597,951,467 $548,945,037 $49,006,430 $145,870,000 $96,985,000 $48,885,000 $139,870,000 $90,985,000 $48,885,000 $149,870,000 $100,985,000 $48,885,000 $152,870,000 $103,985,000 $48,885,000 $152,870,000 $103,985,000 $48,885,000 $173,770,000 $124,885,000 $48,885,000 $173,770,000 $124,885,000 $48,885,000
General Revenue-Dedicated $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218 $1,460,436 $730,218 $730,218
Federal Funds $12,839,176,159 $6,220,145,684 $6,619,030,475 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182 $12,071,368,444 $6,272,486,262 $5,798,882,182
Other Funds $23,877,275,936 $11,862,533,612 $12,014,742,324 $28,135,961,831 $15,655,739,669 $12,480,222,162 $28,135,961,831 $15,655,739,669 $12,480,222,162 $27,672,710,634 $14,797,102,499 $12,875,608,135 $27,672,710,634 $14,797,102,499 $12,875,608,135 $27,672,710,634 $14,797,102,499 $12,875,608,135 $27,677,710,634 $14,802,102,499 $12,875,608,135 $27,677,710,634 $14,802,102,499 $12,875,608,135
Total, method of financing $37,315,863,998 $18,632,354,551 $18,683,509,447 $40,354,660,711 $22,025,941,149 $18,328,719,562 $40,348,660,711 $22,019,941,149 $18,328,719,562 $39,895,409,514 $21,171,303,979 $18,724,105,535 $39,898,409,514 $21,174,303,979 $18,724,105,535 $39,898,409,514 $21,174,303,979 $18,724,105,535 $39,924,309,514 $21,200,203,979 $18,724,105,535 $39,924,309,514 $21,200,203,979 $18,724,105,535

Riders

In the 2026-27 Act, against the version before it: 1 new · 59 unchanged · 18 not in this version.

Rider 2024-25 ActIntroduced (Senate)Introduced (House)Senate substituteHouse substituteHouse passedConference2026-27 Act
Performance Measure Targets 1 First version 1 Amended 1 Amended 1 Unchanged 1 Unchanged 1 Unchanged 1 Unchanged 1 Unchanged
Capital Budget 2 First version 2 Amended 2 Amended 2 Unchanged 2 Unchanged 2 Unchanged 2 Unchanged 2 Unchanged
Transfer Authority 3 First version 3 Unchanged 3 Unchanged 3 Unchanged 3 Unchanged 3 Unchanged 3 Unchanged 3 Unchanged
Magazine Appropriations 4 First version 4 Updated years only 4 Updated years only 4 Unchanged 4 Unchanged 4 Unchanged 4 Unchanged 4 Unchanged
Limitation on Residences 5 First version 5 Unchanged 5 Unchanged 5 Unchanged 5 Unchanged 5 Unchanged 5 Unchanged 5 Unchanged
Refunds and Lawsuit Costs 6 First version 6 Unchanged 6 Unchanged 6 Unchanged 6 Unchanged 6 Unchanged 6 Unchanged 6 Unchanged
Minimum Wage Contracts 7 First version 7 Unchanged 7 Unchanged 7 Unchanged 7 Unchanged 7 Unchanged 7 Unchanged 7 Unchanged
Aviation Services Appropriations 8 First version 8 Updated years only 8 Updated years only 8 Amended 8 Unchanged 8 Unchanged 8 Unchanged 8 Unchanged
Trust Fund 927 9 First version 9 Unchanged 9 Unchanged 9 Unchanged 9 Unchanged 9 Unchanged 9 Unchanged 9 Unchanged
State Highway Fund Reimbursement 10 First version 10 Unchanged 10 Unchanged 10 Unchanged 10 Unchanged 10 Unchanged 10 Unchanged 10 Unchanged
District Discretionary Funds 11 First version 11 Unchanged 11 Unchanged 11 Unchanged 11 Unchanged 11 Unchanged 11 Unchanged 11 Unchanged
Travel Information 12 First version 12 Unchanged 12 Unchanged 12 Unchanged 12 Unchanged 12 Unchanged 12 Unchanged 12 Unchanged
Reporting Requirements 14 First version 14 Amended 14 Amended 13 Amended 13 Amended 13 Unchanged 13 Amended 13 Unchanged
Green Ribbon Project Expansion 15 First version 15 Unchanged 15 Unchanged 14 Unchanged 14 Unchanged 14 Unchanged 14 Unchanged 14 Unchanged
Miscellaneous Pay Provisions 16 First version 16 Unchanged 16 Unchanged 15 Unchanged 15 Unchanged 15 Unchanged 15 Unchanged 15 Unchanged
Bond Programs 17 First version 17 Amended 17 Amended 16 Unchanged 16 Unchanged 16 Unchanged 16 Unchanged 16 Unchanged
Additional Funds 18 First version 18 Amended 18 Amended 17 Unchanged 17 Unchanged 17 Unchanged 17 Unchanged 17 Unchanged
Local Government Assistance 19 First version 19 Unchanged 19 Unchanged 18 Unchanged 18 Unchanged 18 Unchanged 18 Unchanged 18 Unchanged
Appropriations Limited to Revenue Collections: Rail Safety 20 First version 20 Amended 20 Amended 19 Unchanged 19 Unchanged 19 Unchanged 19 Unchanged 19 Unchanged
Road Construction and Maintenance at State Facilities 21 First version 21 Unchanged 21 Unchanged 20 Unchanged 20 Unchanged 20 Unchanged 20 Unchanged 20 Unchanged
Colonia Projects 22 First version 22 Updated years only 22 Updated years only 21 Unchanged 21 Unchanged 21 Unchanged 21 Unchanged 21 Unchanged
Public Transportation 23 First version 23 Unchanged 23 Unchanged 22 Unchanged 22 Unchanged 22 Unchanged 22 Unchanged 22 Unchanged
Crash Records Information System 24 First version 24 Updated years only 24 Updated years only 23 Unchanged 23 Unchanged 23 Unchanged 23 Unchanged 23 Unchanged
Sale of Surplus Property 25 First version 25 Amended 25 Amended 24 Unchanged 24 Unchanged 24 Unchanged 24 Unchanged 24 Unchanged
Toll Project Subaccounts 26 First version 26 Unchanged 26 Unchanged 25 Unchanged 25 Unchanged 25 Unchanged 25 Unchanged 25 Unchanged
Clothing Provision 27 First version 27 Unchanged 27 Unchanged 26 Unchanged 26 Unchanged 26 Unchanged 26 Unchanged 26 Unchanged
Federal Funding for the Texas Rail Plan 28 First version 28 Unchanged 28 Unchanged 27 Unchanged 27 Unchanged 27 Unchanged 27 Unchanged 27 Unchanged
Unexpended Balances Appropriation: Acquisition of Information Resource Technologies, Centralized Accounting and Payroll/Personnel System (CAPPS), Cybersecurity, and Legacy Modernization 29 First version 29 Updated years only 29 Updated years only 28 Amended 28 Unchanged 28 Unchanged 28 Unchanged 28 Unchanged
Unexpended Balances Appropriation: Construction Contracts and Construction Grants and Services 30 First version 30 Updated years only 30 Updated years only 29 Unchanged 29 Unchanged 29 Unchanged 29 Unchanged 29 Unchanged
Debt Reduction Report 31 First version 31 Unchanged 31 Unchanged 30 Unchanged 30 Unchanged 30 Unchanged 30 Unchanged 30 Unchanged
Study on Transportation Technology 32 First version 32 Unchanged 32 Unchanged 31 Unchanged 31 Unchanged 31 Unchanged 31 Unchanged 31 Unchanged
Interagency Contract for Legal Services 33 First version 33 Updated years only 33 Updated years only 32 Unchanged 32 Unchanged 32 Unchanged 32 Unchanged 32 Unchanged
Appropriation of Rail Receipts from Car Load Fees 34 First version 34 Unchanged 34 Unchanged 33 Unchanged 33 Unchanged 33 Unchanged 33 Unchanged 33 Unchanged
Proposition 1 Appropriations 35 First version 35 Amended 35 Amended 34 Amended 34 Unchanged 34 Unchanged 34 Unchanged 34 Unchanged
Proposition 7 Appropriations 36 First version 36 Amended 36 Amended 35 Amended 35 Unchanged 35 Unchanged 35 Unchanged 35 Unchanged
Port Access Improvements 37 First version 37 Amended 37 Amended 36 Unchanged 36 Unchanged 36 Unchanged 36 Unchanged 36 Unchanged
Toll Vendor Contracts 38 First version 38 Unchanged 38 Unchanged 37 Unchanged 37 Unchanged 37 Unchanged 37 Unchanged 37 Unchanged
Limitation on Expenditures for High-speed Rail 39 First version 39 Unchanged 39 Unchanged 38 Unchanged 38 Unchanged 38 Unchanged 38 Unchanged 38 Unchanged
Unexpended Balances Appropriation: Construction of Buildings and Facilities, Repair or Rehabilitation of Buildings and Facilities, and Acquisition of Land and Other Real Property 40 First version 40 Updated years only 40 Updated years only 39 Unchanged 39 Unchanged 39 Unchanged 39 Unchanged 39 Unchanged
Austin Campus Consolidation — 41 New 41 New 40 Unchanged 40 Unchanged 40 Unchanged 40 Unchanged 40 Unchanged
Limitation on Employment Levels 42 First version 42 Amended 42 Amended 41 Unchanged 41 Unchanged 41 Unchanged 41 Unchanged 41 Unchanged
Comprehensive Development Agreements 43 First version 43 Unchanged 43 Unchanged 42 Unchanged 42 Unchanged 42 Unchanged 42 Unchanged 42 Unchanged
Limitation on Expenditure of Funds 44 First version 44 Unchanged 44 Unchanged 43 Unchanged 43 Unchanged 43 Unchanged 43 Unchanged 43 Unchanged
Southern Gateway Deck Park 47 First version 46 Amended 46 Amended 44 Unchanged 44 Unchanged 44 Unchanged 44 Unchanged 44 Unchanged
Unexpended Balance Appropriation: Improvements to the Sugar Land Regional Airport — 47 New 47 New 45 Unchanged 45 Unchanged 45 Unchanged 45 Unchanged 45 Unchanged
Improvements to Wharton County Weigh Station Site — 49 New 49 New 47 Unchanged 47 Unchanged 47 Unchanged 46 Unchanged 46 Unchanged
Unexpended Balance Appropriation: Improvements to Pharr International Bridge — — — 49 New 49 Unchanged 49 Unchanged 47 Unchanged 47 Unchanged
Sergio Ivan Rodriguez Memorial Pedestrian Bridge Project — — — — — — 48 New 48 Unchanged
Southern Gateway Deck Park — — — — — — 49 New 49 Unchanged
Interstate 10 Deck Park Plaza Project — — — — — — 50 New 50 Unchanged
Engineering and Engineering-Related Service Contracts — — — — 50 New 50 Unchanged 51 Amended 51 Unchanged
State Highway 71 Pedestrian Crossing — — — — 52 New 52 Unchanged 52 Amended 52 Unchanged
Southwestern Medical District Transformation Project — — — — — — 53 New 53 Unchanged
Space Industry Corridor — — — — — — 54 New 54 Unchanged
Railroad Grade Crossing Bridge Project at Little York Road and Hirsch Road — — — — — — 55 New 55 Unchanged
Railroad Grade Crossing Bridge Project at Tidwell Road and Hirsch Road — — — — — — 56 New 56 Unchanged
Improvements to Farm to Market Road 653 — — — — — — 57 New 57 Unchanged
Texas State Railroad — — — — — — 58 New 58 Unchanged
Improvements to Victoria Regional Airport — 50 New 50 New 48 Unchanged 48 Unchanged 48 Unchanged 59 Amended 59 Unchanged
Department of Transportation: Direction for Aviation Services Funded in House Bill 500 — — — — — — — 60 New
State Highway 99 Access Road Improvements — 48 New 48 New 46 Unchanged 46 Unchanged 46 Unchanged — —
Ysleta Port of Entry Modernization and Expansion Project — — — — 51 New 51 Unchanged — —
Presidio International Bridge — — — — — 53 New — —
Sergio Ivan Rodriguez Memorial Pedestrian Bridge Project — — — 50 New — — — —
Southern Gateway Deck Park — — — 51 New — — — —
Interstate 10 Deck Park Plaza Project — — — 52 New — — — —
Full-Time Equivalent: Summer Hire Program 13 First version 13 Unchanged 13 Unchanged — — — — —
Unexpended Balance: Construction of Intelligent Transportation Systems 45 First version 45 Unchanged 45 Unchanged — — — — —
Additional Funding Allocation for Aircraft Maintenance Services — 51 New — — — — — —
Austin Campus Consolidation 41 First version — — — — — — —
Appropriation for Ship Channel Improvement Revolving Loan Program 46 First version — — — — — — —
Evaluation of Medium-Duty and Heavy-Duty Vehicle Charging Infrastructure and Capacity 48 First version — — — — — — —
Railroad Grade Separation Project Study 49 First version — — — — — — —
U.S. 290 Traffic Study 50 First version — — — — — — —
Port of Victoria Rail Expansion Study 51 First version — — — — — — —
Appropriations for Department of Transportation 52 First version — — — — — — —
South Texas International Airport 53 First version — — — — — — —
Emergency and First Responder Airport Facilities 54 First version — — — — — — —

2028-29 request

What this agency asked for in its request: each item above its baseline, with its figures and the page of the request it was read from.

Source pages