Riders · Department of Transportation · Article VII: Business and Economic Development
Performance Measure Targets
Rider 1 in the 2026-27 Act, page VII-15
2028-29 request. Department of Transportation's request has a row with this rider's number. What that row asks could not be checked, so it is not shown. The agency's request.
Through the session
- 2024-25 Act In current law rider 1
- Introduced (Senate) Amended rider 1
- Introduced (House) Amended rider 1
- Senate substitute Unchanged rider 1
- House substitute Unchanged rider 1
- House passed Unchanged rider 1
- Conference Unchanged rider 1
- 2026-27 Act Unchanged rider 1
Pick any two steps to compare their wording.
What changed in the text
2024-25 Act → Introduced (House): 7 passages changed.
Removed words are struck through; added words are underlined. Sources: 2024-25 Act · Introduced (House).
Every version: numbers, statuses and source pages
| Version | Rider | Against the version before | Against the current budget | Source |
|---|---|---|---|---|
| 2024-25 ActGeneral Appropriations Act, 2024-25 Biennium | 1 | First version | — | Page VII-20 |
| Introduced (Senate)Senate Bill 1 as introduced (LBB recommended, Senate) | 1 | Amended | — | Page VII-21 |
| Introduced (House)House Bill 1 as introduced (LBB recommended, House) | 1 | Amended | — | Page VII-21 |
| Senate substituteCommittee Substitute for Senate Bill 1 | 1 | Unchanged | Amended | Page VII-19 |
| House substituteHouse Committee Substitute for Senate Bill 1 | 1 | Unchanged | Amended | Page VII-20 |
| House passedSenate Bill 1 as passed the second house | 1 | Unchanged | Amended | Page VII-19 |
| ConferenceConference Committee Report for Senate Bill 1 | 1 | Unchanged | Amended | Page VII-15 |
| 2026-27 ActGeneral Appropriations Act, 2026-27 Biennium | 1 | Unchanged | Amended | Page VII-15 |
Full text of each wording
Introduced (Senate), Introduced (House), Senate substitute, House substitute, House passed, Conference, 2026-27 Act
Source, page VII-15Performance Measure Targets. The following is a listing of the key performance target levels for the Department of Transportation. It is the intent of the Legislature that appropriations made by this Act be utilized in the most efficient and effective manner possible to achieve the intended mission of the Department of Transportation. In order to achieve the objectives and service standards established by this Act, the Department of Transportation shall make every effort to attain the following designated key performance target levels associated with each item of appropriation.
2026 2027
A. Goal: PROJECT DEVELOPMENT AND DELIVERY Outcome (Results/Impact):
Percent of Design Projects Delivered on Time 90% 90%
Percent of Construction Projects Completed on Budget 85% 85%
Percent of Two-lane Highways 26 Feet or Wider in Paved Width 58.1% 58.3%
Percent of Construction Projects Completed on Time 70% 70%
A.1.1. Strategy: PLAN/DESIGN/MANAGE Output (Volume):
Number of Construction Plans Processed for Statewide
Construction Letting 790 790
Dollar Volume of Construction Contracts Awarded
(Millions) 6,500 6,500
Number of Construction Contracts Awarded 765 765
B. Goal: ROUTINE SYSTEM MAINTENANCE Outcome (Results/Impact):
Bridge Inventory Condition Score 89.02 89.04
Percent of Highway Pavements in Good or Better Condition 90% 90%
B.1.1. Strategy: CONTRACTED ROUTINE MAINTENANCE Output (Volume):
Number of Lane Miles Contracted for Resurfacing 19,000 19,000
B.1.2. Strategy: ROUTINE MAINTENANCE Output (Volume):
Number of Highway Lane Miles Resurfaced by State Forces 6,500 6,500
C. Goal: OPTIMIZE SERVICES AND SYSTEMS Outcome (Results/Impact):
Percent Change in the Number of Small Urban and Rural
Transit Trips 1% 1%
Number of Fatalities Per 100,000,000 Miles Traveled 0.87 0.86
Percent of General Aviation Airport Runways in Good or
Excellent Condition 60% 60%
C.5.1. Strategy: AVIATION SERVICES Output (Volume):
Number of Grants Approved for Airports Selected for
Financial Assistance 70 70
D. Goal: ENHANCE RAIL TRANSPORTATION D.1.4. Strategy: RAIL SAFETY Output (Volume):
Number of Federal Railroad Administration (FRA) Units
Inspected 130,000 130,000
2024-25 Act
Source, page VII-20Performance Measure Targets. The following is a listing of the key performance target levels for the Department of Transportation. It is the intent of the Legislature that appropriations made by this Act be utilized in the most efficient and effective manner possible to achieve the intended mission of the Department of Transportation. In order to achieve the objectives and service standards established by this Act, the Department of Transportation shall make every effort to attain the following designated key performance target levels associated with each item of appropriation.
2024 2025
A. Goal: PROJECT DEVELOPMENT AND DELIVERY Outcome (Results/Impact):
Percent of Design Projects Delivered on Time 90% 90%
Percent of Construction Projects Completed on Budget 85% 85%
Percent of Two-lane Highways 26 Feet or Wider in Paved Width 54.8% 54.9%
Percent of Construction Projects Completed on Time 65% 65%
A.1.1. Strategy: PLAN/DESIGN/MANAGE Output (Volume):
Number of Construction Plans Processed for Statewide
Construction Letting 765 765
Dollar Volume of Construction Contracts Awarded
(Millions) 6,500 6,500
Number of Construction Contracts Awarded 765 765
B. Goal: ROUTINE SYSTEM MAINTENANCE Outcome (Results/Impact):
Bridge Inventory Condition Score 88.68 88.59
Percent of Highway Pavements in Good or Better Condition 90% 90%
B.1.1. Strategy: CONTRACTED ROUTINE MAINTENANCE Output (Volume):
Number of Lane Miles Contracted for Resurfacing 19,000 19,000
B.1.2. Strategy: ROUTINE MAINTENANCE Output (Volume):
Number of Highway Lane Miles Resurfaced by State Forces 6,500 6,500
C. Goal: OPTIMIZE SERVICES AND SYSTEMS Outcome (Results/Impact):
Percent Change in the Number of Small Urban and Rural
Transit Trips 1% 1%
Number of Fatalities Per 100,000,000 Miles Traveled 1.14 1.09
Percent of General Aviation Airport Runways in Good or
Excellent Condition 60% 60%
C.5.1. Strategy: AVIATION SERVICES Output (Volume):
Number of Grants Approved for Airports Selected for
Financial Assistance 70 70
D. Goal: ENHANCE RAIL TRANSPORTATION D.1.4. Strategy: RAIL SAFETY Output (Volume):
Number of Federal Railroad Administration (FRA) Units
Inspected 119,000 119,000